04.08.2013 Views

annual report 1994-95 ministry of power

annual report 1994-95 ministry of power

annual report 1994-95 ministry of power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sector State Impl. Unit Name U. No. Type Unit Actual/Expected<br />

Agency MW Capacity Comm. Schedule<br />

SOUTHERN REGION<br />

SS AP APSEB UPPER SILERU 2 H 60.00 02/ <strong>95</strong><br />

SS AP APSEB RAYALSEEMA 2 T 210.00 09/<strong>95</strong><br />

SS AP APSEB VIJAYAWADA 6 T 210.00 03/ <strong>95</strong><br />

SS KAR KPCL RAICHUR 4 T 210.00 10/ 94<br />

SS TN TNEB NORTH MADRAS 1 T 210.00 10/ 94<br />

SS TN TNEB NORTH MADRAS 2 T 210.00 03 / <strong>95</strong><br />

SS TN TNEB BASIN BRIDGE GT 1 T 30.00 02/ <strong>95</strong><br />

SS KER KSEB KALLADA 1 H 7.50 08/ 94<br />

SUB-TOTAL (SR) 1147.50<br />

EASTERN REGION<br />

CS BIH NTPC KAHALGAON 3 T 210.00 03/ <strong>95</strong><br />

SS BIH TVNL TENUGHAT 1 T 210.00 04/ 94<br />

SS BIH BHPC E. GANDAK CANAL 1 H 5.00 07/ 94<br />

SS BIH BHPC E. GANDAK CANAL 2 H 5.00 08/94<br />

SS BIH BHPC E. GANDAK CANAL 3 H 5.00 09/94<br />

SS ORI OPGC IB VALLEY 1 T 210.00 04/ 94<br />

SS ORI OPGC IB VALLEY 2 T 210.00 12/ 94<br />

CS ORI NTPC TALCHER 1 T 500.00 08/ 94<br />

CS WB DVC MEJIA 1 T 210.00 02/<strong>95</strong><br />

SS WB WBPDC RAMMAN II 1 H 12.50 02/ <strong>95</strong><br />

SS WB WBPDC RAMMAN II 2 H 12.50 03/ <strong>95</strong><br />

SUB-TOTAL (ER) 1590.00<br />

NORTH EASTERN REGION<br />

CS ASSAM NEEPCO KATHALGURI GT 1 T 33.50 01/<strong>95</strong><br />

CS ASSAM NEEPCO KATHALGURI GT 2 T 33.50 02/<strong>95</strong><br />

SS ASSAM ASEB LAKWA GT II 7 T 20.00 10/94<br />

SUB-TOTAL (NER) 87.00<br />

TOTAL ALL INDIA 4818.75<br />

12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!