Law and order Problems : The Project area<br />
at present is peaceful. Full strength <strong>of</strong> CISF<br />
personnel have been posted at site.<br />
Diversion Tunnel : Boring <strong>of</strong> the entire<br />
length <strong>of</strong> 633 M tunnel has been completed.<br />
Lining works are in progress and programmed<br />
for completion by March ’<strong>95</strong>. Work order<br />
for fabrication and erection <strong>of</strong> the Intake gate<br />
for Diversion Tunnel has been placed. The<br />
Diversion Tunnel will be completed in Aug.<br />
’<strong>95</strong>.<br />
Power House : On completion <strong>of</strong> excavation<br />
works, Civil works for Power House Building<br />
have been started and Ist stage concreting for<br />
lowering D.T. Liner have been completed.<br />
D.T. Liner is under erection.<br />
The T.G. Unit <strong>of</strong> the Power Station are being<br />
manufactured by M/s BHEL and substantial<br />
parts have already been despatched by them<br />
and received at site. Manufacturing works<br />
are proceeding satisfactorily.<br />
Plan Allocation : Against a requirement <strong>of</strong><br />
Rs. 75.00 Crs. for the year <strong>1994</strong>-<strong>95</strong>, the<br />
approved allocation stands at Rs. 30.00 Crs.<br />
(iii) Ranganadi H.E. Project (405 MW)<br />
Arunachal Pradesh<br />
This Project is located in the Lower Subansiri<br />
District <strong>of</strong> Arunanchal Pradesh and has a<br />
provision for installing 3 Units <strong>of</strong> 135 MW<br />
each. The cost <strong>of</strong> the Project has been updated<br />
upto Feb. ’93 price level and stands at Rs.<br />
675.74 crs. The Project envisages to generate<br />
1874 MU <strong>annual</strong>ly at rated capacity. The Ist<br />
135 MW Unit <strong>of</strong> the Project is scheduled for<br />
commissioning within the VIIlth Plan period,<br />
i.e. March, 1997 and the project is expected<br />
to be fully commissioned by July 1997.<br />
Infrastructural Development<br />
All infrastructural development like roads &<br />
buildings construction, <strong>power</strong> and land<br />
acquisition have been completed.<br />
49<br />
Major Works<br />
Diversion Tunnel : Work <strong>of</strong> Diversion Tunnel<br />
has been completed.<br />
Main Tunnel : The work <strong>of</strong> Main Tunnel is<br />
progressing satisfactorily. Initial geological<br />
problems have been overcome and the bad<br />
geological stretch has been crossed. Boring<br />
<strong>of</strong> 4220 M <strong>of</strong> Tunnel length has been<br />
completed out <strong>of</strong> 10271 M. Imported<br />
Tunnelling Equipments such as Drilling<br />
jumbos, Rock Bolters and Shotereting<br />
equipments have been deployed in different<br />
faces for expediting the work.<br />
Diversion Dam :4 (four) bidders have been<br />
techno commercially qualified for the work<br />
and for opening <strong>of</strong> their price bids which is<br />
due on 20.12.<strong>1994</strong>. Order for Diversion Dam is<br />
scheduled to be placed by February, <strong>95</strong>. The<br />
work is scheduled to take 48 months for<br />
completion.<br />
Plan Allocation : Rs. 56 Crores was allocated<br />
for the year <strong>1994</strong>-<strong>95</strong> against proposal <strong>of</strong> Rs.<br />
130.00 Crores.<br />
(iv) Assam gas based combined cycle <strong>power</strong><br />
project (291 MW) Assam<br />
This Project is located in Dibrugarh District<br />
<strong>of</strong> Upper Assam. The Project was<br />
administratively approved in November 1987<br />
for installing 6 (six) units <strong>of</strong> Gas Turbines and<br />
3 (three) units <strong>of</strong> Steam Turbine to utilise the<br />
waste heat with a total installing Capacity <strong>of</strong><br />
291 MW. The latest cost as per November,<br />
<strong>1994</strong> price level works out to Rs. 1209.26<br />
crores.<br />
The required gas I MCMD shall be supplied<br />
by M/s. Oil India Ltd. from its Kathalguri<br />
Off Take Point which is 8 K.M. away from<br />
the Project site.<br />
The Govt. <strong>of</strong> India has tied up with the<br />
Overseas Economic Corporation Fund<br />
(OECF) Japan, for loan assistance for<br />
implementation <strong>of</strong> the Project. M/s.<br />
Mitsubishi Corporation and M/s. BHEL