Law and order Problems : The Project area<br />

at present is peaceful. Full strength <strong>of</strong> CISF<br />

personnel have been posted at site.<br />

Diversion Tunnel : Boring <strong>of</strong> the entire<br />

length <strong>of</strong> 633 M tunnel has been completed.<br />

Lining works are in progress and programmed<br />

for completion by March ’<strong>95</strong>. Work order<br />

for fabrication and erection <strong>of</strong> the Intake gate<br />

for Diversion Tunnel has been placed. The<br />

Diversion Tunnel will be completed in Aug.<br />

’<strong>95</strong>.<br />

Power House : On completion <strong>of</strong> excavation<br />

works, Civil works for Power House Building<br />

have been started and Ist stage concreting for<br />

lowering D.T. Liner have been completed.<br />

D.T. Liner is under erection.<br />

The T.G. Unit <strong>of</strong> the Power Station are being<br />

manufactured by M/s BHEL and substantial<br />

parts have already been despatched by them<br />

and received at site. Manufacturing works<br />

are proceeding satisfactorily.<br />

Plan Allocation : Against a requirement <strong>of</strong><br />

Rs. 75.00 Crs. for the year <strong>1994</strong>-<strong>95</strong>, the<br />

approved allocation stands at Rs. 30.00 Crs.<br />

(iii) Ranganadi H.E. Project (405 MW)<br />

Arunachal Pradesh<br />

This Project is located in the Lower Subansiri<br />

District <strong>of</strong> Arunanchal Pradesh and has a<br />

provision for installing 3 Units <strong>of</strong> 135 MW<br />

each. The cost <strong>of</strong> the Project has been updated<br />

upto Feb. ’93 price level and stands at Rs.<br />

675.74 crs. The Project envisages to generate<br />

1874 MU <strong>annual</strong>ly at rated capacity. The Ist<br />

135 MW Unit <strong>of</strong> the Project is scheduled for<br />

commissioning within the VIIlth Plan period,<br />

i.e. March, 1997 and the project is expected<br />

to be fully commissioned by July 1997.<br />

Infrastructural Development<br />

All infrastructural development like roads &<br />

buildings construction, <strong>power</strong> and land<br />

acquisition have been completed.<br />

49<br />

Major Works<br />

Diversion Tunnel : Work <strong>of</strong> Diversion Tunnel<br />

has been completed.<br />

Main Tunnel : The work <strong>of</strong> Main Tunnel is<br />

progressing satisfactorily. Initial geological<br />

problems have been overcome and the bad<br />

geological stretch has been crossed. Boring<br />

<strong>of</strong> 4220 M <strong>of</strong> Tunnel length has been<br />

completed out <strong>of</strong> 10271 M. Imported<br />

Tunnelling Equipments such as Drilling<br />

jumbos, Rock Bolters and Shotereting<br />

equipments have been deployed in different<br />

faces for expediting the work.<br />

Diversion Dam :4 (four) bidders have been<br />

techno commercially qualified for the work<br />

and for opening <strong>of</strong> their price bids which is<br />

due on 20.12.<strong>1994</strong>. Order for Diversion Dam is<br />

scheduled to be placed by February, <strong>95</strong>. The<br />

work is scheduled to take 48 months for<br />

completion.<br />

Plan Allocation : Rs. 56 Crores was allocated<br />

for the year <strong>1994</strong>-<strong>95</strong> against proposal <strong>of</strong> Rs.<br />

130.00 Crores.<br />

(iv) Assam gas based combined cycle <strong>power</strong><br />

project (291 MW) Assam<br />

This Project is located in Dibrugarh District<br />

<strong>of</strong> Upper Assam. The Project was<br />

administratively approved in November 1987<br />

for installing 6 (six) units <strong>of</strong> Gas Turbines and<br />

3 (three) units <strong>of</strong> Steam Turbine to utilise the<br />

waste heat with a total installing Capacity <strong>of</strong><br />

291 MW. The latest cost as per November,<br />

<strong>1994</strong> price level works out to Rs. 1209.26<br />

crores.<br />

The required gas I MCMD shall be supplied<br />

by M/s. Oil India Ltd. from its Kathalguri<br />

Off Take Point which is 8 K.M. away from<br />

the Project site.<br />

The Govt. <strong>of</strong> India has tied up with the<br />

Overseas Economic Corporation Fund<br />

(OECF) Japan, for loan assistance for<br />

implementation <strong>of</strong> the Project. M/s.<br />

Mitsubishi Corporation and M/s. BHEL