Quick Install Guide - Pitney Bowes Canada
Quick Install Guide - Pitney Bowes Canada
Quick Install Guide - Pitney Bowes Canada
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Alternative Set-up: Using an Analog Phone Line<br />
2 <strong>Install</strong> Scale<br />
Position the scale on top of the meter as shown.<br />
Connect the scale cable to the scale connector on the back of the<br />
mailstation 2 at the scale icon.<br />
Tighten the screws to ensure a secure connection.<br />
If you want to place the scale in a different location, an optional<br />
four-foot scale cable can be purchased by contacting <strong>Pitney</strong> <strong>Bowes</strong>.<br />
3 Connect<br />
Lock<br />
Class<br />
Funds<br />
*#_ ABC DEF<br />
Menu<br />
GHI JKL MNO<br />
PQRS TUV WXYZ<br />
Back Space<br />
Shift<br />
.<br />
Power<br />
Plug the power cord into<br />
the unit as shown and into<br />
a convenient outlet that is<br />
not controlled by a switch<br />
or surge protector. There is<br />
no on/off switch on your meter.<br />
4 Select<br />
Review<br />
no<br />
Enter<br />
yes<br />
Press the number 1 key to select English.<br />
Press the number 2 key to select French.<br />
14<br />
Language<br />
Select Language<br />
1. English<br />
Power