Processing Product:<br />
a. Note: always close the Buffer and Filtrate valve before starting or stopping the <strong>PureTec</strong>.<br />
Fill the Diafiltration Vessel with the solution to be processed and close the container.<br />
b. If needed, refill the Exchange Buffer Reservoir and empty the Filtrate Reservoir. Place<br />
the tubing back in both containers.<br />
c. If required, edit the Pump Rate and other parameters entered during the priming process.<br />
Press “Execute” and then “RUN” from the front panel to start the pump. If the system<br />
was not previously primed, a decrease in volume in the Vessel will be observed. This<br />
volume will be recovered at the end of the process.<br />
d. To concentrate the product, keep the Buffer Valve closed and open the Filtrate Valve<br />
and Air Vent Valve. This will reduce the volume in the Diafiltration Vessel as the Filtrate<br />
is removed, thus concentrating the solution. When the desired concentration volume has<br />
been achieved, close the Filtrate and Air Vent Valves.<br />
e. To wash the concentrated solution, open only the Filtrate and Buffer Valves. Once the<br />
solution is concentrated, the <strong>PureTec</strong> could be stopped, the Cumulative Counters<br />
cleared, and the Filtrate Weight alarm set to stop the pump when the desired amount of<br />
Exchange Buffer has been collected in the Filtrate Reservoir. The balance also allows<br />
you to monitor the Permeate Flow Rate (FP), which can be optimized by altering the<br />
pump rate on the fly from the front panel. Press the “RATE” key, increase or decrease<br />
the rate as needed, and press “C” to select it. The Exchange Buffer will be added at the<br />
same rate the Filtrate is removed by the vacuum created in the Diafiltration Vessel.<br />
If there is more solution to process than the Vessel would originally hold, more can be<br />
added by connecting the Exchange Buffer tubing to a container with additional process<br />
solution. When this container is empty, the pump could be stopped, the tubing<br />
reconnected to the Exchange Buffer, and the solution either concentrated further or<br />
washed.<br />
f. To empty the Diafiltration Vessel at the end of the run, close the Buffer and Filtrate<br />
valves, and Stop the pump. Close the Valve on the Retentate return line at the bottom of<br />
the Vessel. Have a container ready for the transfer. Disconnect the return line at the<br />
valve, and carefully place it in the container. Open the Air Vent valve, and press RUN on<br />
the pump, this will pump the contents of the Diafiltration Vessel out through the pump and<br />
filter cartridge and into the transfer container. Re-connect the tubing, open the Retentate<br />
valve again, and your system is ready for cleaning.<br />
Documentation:<br />
The <strong>PureTec</strong> displays and prints out several filtration-related parameters. The user can scroll<br />
though three display options providing an instantaneous overview of the filtration progress<br />
and status. All information is printed out in an “Excel-friendly” format. Alternatively, our<br />
SciDoc Software, which uses WinWedge software in conjunction with a customized Excel<br />
spreadsheet, can be used to summarize the filtration data and create graphical<br />
representations of the data on your PC as shown below:<br />