EPSILON-CF IOM.pdf - Industrial Air
EPSILON-CF IOM.pdf - Industrial Air
EPSILON-CF IOM.pdf - Industrial Air
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
We strongly recommend installing a pressure relief valve on the<br />
hydraulic circuit (standard supply on version ST). In the event of<br />
serious system breakdown or emergency (e.g. fire), the system will<br />
be depressurised via the relief valve thus forestalling possible pipe<br />
bursts. Always connect the relief valve outlet to a pipe of diameter<br />
no smaller than the valve opening, and route it to a location in which<br />
persons are protected from the jet of expelled water.<br />
Caution: When making hydraulic connections never use naked flames<br />
close to or inside the unit.<br />
6.5 WATER FLOW SWITCH INSTALLATION INSTRUCTIONS<br />
– Clean the pipeline system into which the flow switch is to be fitted and take away any magnetic particle,<br />
such as welding residues.<br />
– Connect the “T” shaped metallic manifold (on which the flow switch is mounted) into the evaporator male<br />
threaded water outlet labelled with:<br />
Make the electrical<br />
connections on the<br />
terminal board<br />
USER WATER<br />
To avoid leakage, seal the connection by using teflon. The flow switch should be installed on the heat exchanger<br />
that is closer to the electrical board.<br />
User exchanger<br />
(evaporator)<br />
Figure 5<br />
<strong>Air</strong> Blue • 14