SUMO - Eltis
SUMO - Eltis
SUMO - Eltis
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
16<br />
PROJECT START<br />
Describe task and set<br />
overall goals.<br />
Define the target groups<br />
measures are to focus on.<br />
Describe the organisation and<br />
services that suit the project.<br />
Review all analysis levels and<br />
define suitable targets.<br />
Choose specific indicators and<br />
suitable methods for the targets<br />
chosen at each analysis level.<br />
Collect data for indicators defined<br />
at the different levels.<br />
Evaluate each measure using a<br />
suitable method.<br />
sumo – System for Evaluation of Mobility Projects<br />
Chapter 4<br />
Chapter 4<br />
Chapter 5<br />
Chapter 6<br />
Chapter 7<br />
MONITORING AND EVALUATION<br />
Procedure:<br />
Task description and<br />
overall goals<br />
Target groups<br />
Working method<br />
Targets for<br />
analysis levels<br />
Indicators<br />
Monitoring<br />
collection of basic data<br />
Evaluation<br />
of collected data<br />
Figure 3.2 The <strong>SUMO</strong> process – a multi-step procedure initiated at the start when<br />
planning a project