© Green Cat Renewables Ltd<br />
GLENLORA WIND TURBINE<br />
The single turbine proposed is positioned at location 1 in Figure 1.1.2 above. National<br />
grid coordinates for the turbine are detailed in Table 1.1.2 above.<br />
1.2.1 Site Layout<br />
Every effort has been made to ensure that the project and associated infrastructure<br />
are positioned to take account of the assessments identified in this report notably<br />
ecology, landscape/visual effects and noise.<br />
The planning application layout has been finalised following a design development<br />
process which has balanced the need to capture the greatest energy from the wind at<br />
the site while respecting any site specific constraints identified and engineering<br />
considerations.<br />
As the project involves a single turbine any undesirable clustering effects will be<br />
avoided.<br />
Glenlora Estate extends to circa 100 acres and comprises garden grounds which are<br />
well maintained with the capacity to house grazing animals. The area taken by the<br />
proposed project is small and it is therefore anticipated that the existing land use<br />
would continue around the wind turbines and associated infrastructure.<br />
1.2.2 Project Detailed Design<br />
It is intended that this project will be let as either a single Engineer Procure Contract<br />
(EPC) with a ‘turnkey’ supplier or a pair of back to back EPC contracts with a turbine<br />
supplier and an engineering contractor. As such the detailed design will not be<br />
completed until the turbine supplier and the contractors have been selected. Further,<br />
some aspects of the design cannot be completed until intrusive ground investigations<br />
have been carried out.<br />
The following project description sets out the conceptual design in sufficient detail that<br />
the project can be understood and assessed from a planning perspective. It is<br />
anticipated that some of the more detailed aspects that have not yet been fully<br />
evaluated will be handled as planning conditions.<br />
The EPC contract(s) will be competitively let, however, local contractors or contractors<br />
who sub‐contract work locally will be favoured.<br />
1.2.3 Specification of Wind Turbines<br />
The proposed turbine within the Glenlora Estate would comprise the installation of a<br />
medium sized 800kW wind turbine. A diagram of the principal dimensions of a typical<br />
turbine in this size range is shown in Figure 1.1.3 below.<br />
Page 16 of 173