Supporting documents - Renfrewshire Council
Supporting documents - Renfrewshire Council
Supporting documents - Renfrewshire Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Council</strong><br />
Boundary<br />
© Green Cat Renewables Ltd<br />
Turbine<br />
Location<br />
GLENLORA WIND TURBINE<br />
Figure 3.2.1 ‐ Core Paths Plan<br />
NB – Plan not to scale – Reproduced from map 8, Core Paths Plan, <strong>Renfrewshire</strong> <strong>Council</strong>, 2009.<br />
Path 21 utilises the track to the west of the estate and runs approximately 133m from<br />
the proposed turbine at it’s closest point. Paths Loch 22 and Loch 23 are both minor<br />
public roads which have been designated as core paths. Loch 22 runs along the south<br />
eastern boundary and Loch 23 is 70m from the site boundary at its closest point.<br />
Under the Land Reform (Scotland) Act 2003 the public have a statutory right of<br />
responsible non motorised access to most land and inland water in Scotland, subject to<br />
certain specified exempted categories of land, and to rights reserved to have other<br />
areas of land exempted from access rights. Under this legislation access is not<br />
restricted to paths and tracks. To date <strong>Renfrewshire</strong> <strong>Council</strong> has not exercised its rights<br />
under the Act to exclude from the public’s rights of access, to any part of the Glenlora<br />
Estate.<br />
Current Land Use<br />
The immediate landuse in the locality of the proposed turbine and the turbine site<br />
itself is predominantly agriculture. The proposed turbine and associated access track<br />
will take up a very small area and it is expected that the current use will continue<br />
undisturbed.<br />
Page 46 of 173