Exhibit P-5, Cost Analysis: PB 2014 <strong>Chemical</strong> <strong>and</strong> <strong>Biological</strong> <strong>Defense</strong> <strong>Program</strong> Date: April 2013<br />
Appropriation / Budget Activity / Budget Sub Activity:<br />
0300D: Procurement, <strong>Defense</strong>-Wide / BA 03: <strong>Chemical</strong>/<br />
<strong>Biological</strong> <strong>Defense</strong> / BSA 1: CBDP<br />
Cost Elements<br />
(† indicates <strong>the</strong><br />
presence <strong>of</strong> a P-5A)<br />
ID Unit Cost<br />
CD ($ K )<br />
P-1 Line Item Nomenclature:<br />
PA1600 - COLLECTIVE PROTECTION<br />
LI PA1600 - COLLECTIVE PROTECTION UNCLASSIFIED<br />
<strong>Chemical</strong> <strong>and</strong> <strong>Biological</strong> <strong>Defense</strong> <strong>Program</strong> Page 23 <strong>of</strong> 31 P-1 Line #93<br />
Item Nomenclature (Item Number - Item<br />
Name, DODIC):<br />
R12301 - CB PROTECTIVE SHELTER<br />
(CBPS)<br />
All Prior Years FY 2012 FY 2013 FY 2014 Base FY 2014 OCO FY 2014 Total<br />
Quantity<br />
(Each)<br />
Total<br />
Cost<br />
($ M )<br />
Unit Cost<br />
($ K )<br />
Quantity<br />
(Each)<br />
Total<br />
Cost<br />
($ M )<br />
Unit Cost<br />
($ K )<br />
Quantity<br />
(Each)<br />
Total Support Cost 39.062 5.083 - - - -<br />
Gross Weapon System<br />
Cost<br />
Cost Elements<br />
(† indicates <strong>the</strong><br />
presence <strong>of</strong> a P-5A)<br />
Hardware Cost<br />
Recurring Cost<br />
Prior/Future combined<br />
efforts<br />
† CBPS UP-<br />
ARMORED (*1)<br />
† CBPS UP-<br />
ARMORED (*2)<br />
ID Unit Cost<br />
CD ($ K )<br />
Total<br />
Cost<br />
($ M )<br />
Unit Cost<br />
($ K )<br />
Quantity<br />
(Each)<br />
Total<br />
Cost<br />
($ M )<br />
Unit Cost<br />
($ K )<br />
Quantity<br />
(Each)<br />
Total<br />
Cost<br />
($ M )<br />
Unit Cost<br />
($ K )<br />
Quantity<br />
(Each)<br />
280.526 5.625 - - - -<br />
FY 2015 FY 2016 FY 2017 FY 2018 To Complete Total Cost<br />
Quantity<br />
(Each)<br />
Total<br />
Cost<br />
($ M )<br />
Unit Cost<br />
($ K )<br />
Quantity<br />
(Each)<br />
Total<br />
Cost<br />
($ M )<br />
Unit Cost<br />
($ K )<br />
Quantity<br />
(Each)<br />
Total<br />
Cost<br />
($ M )<br />
Unit Cost<br />
($ K )<br />
- - - - - - - - - - - - - - - - - 203.438<br />
- - - - - - - - - - - - - - - - 77 24.531<br />
- - - - - - - - - - - - - - - - 13 13.495<br />
O<strong>the</strong>r GFE - - - - - - - - - - - - - - - - - 0.542<br />
Total Recurring Cost - - - - - 242.006<br />
Total Hardware Cost - - - - - 242.006<br />
Support Cost<br />
ENGINEERING<br />
SUPPORT<br />
INTEGRATED<br />
LOGISTICS SUPPORT<br />
MANAGEMENT<br />
SUPPORT<br />
NEW EQUIPMENT<br />
TRAINING<br />
TOTAL PACKAGE<br />
FIELDING (SPARES)<br />
- - - - - - - - - - - - - - - - - 20.091<br />
- - - - - - - - - - - - - - - - - 5.428<br />
- - - - - - - - - - - - - - - - - 4.900<br />
- - - - - - - - - - - - - - - - - 2.127<br />
- - - - - - - - - - - - - - - - - 11.599<br />
Total Support Cost - - - - - 44.145<br />
Gross Weapon System<br />
Cost<br />
Quantity<br />
(Each)<br />
Total<br />
Cost<br />
($ M )<br />
Unit Cost<br />
($ K )<br />
Quantity<br />
(Each)<br />
Total<br />
Cost<br />
($ M )<br />
Unit Cost<br />
($ K )<br />
Quantity<br />
(Each)<br />
- - - - - 286.151<br />
P-5 Remarks:<br />
The Services need a highly mobile, self-contained collective protection system which can provide a contamination free working area for Echelon I <strong>and</strong> II medical treatment facilities <strong>and</strong> o<strong>the</strong>r selected units.<br />
The <strong>Chemical</strong> <strong>and</strong> <strong>Biological</strong> Protective Shelter (CBPS) satisfies this need <strong>and</strong> replaces <strong>the</strong> M51 <strong>Chemical</strong> Protective Shelter. The system consists <strong>of</strong> a Collectively Protected (CP) shelter modularized <strong>and</strong><br />
integrated into a service selected prime-mover. The system is completely self contained, self powered, mobile, <strong>and</strong> adaptable to a variety <strong>of</strong> missions. CBPS relieves medical, combat service, <strong>and</strong> combat<br />
Total<br />
Cost<br />
($ M )<br />
Total<br />
Cost<br />
($ M )<br />