Exhibit P-3A, Individual Modification: PB 2014 <strong>Chemical</strong> <strong>and</strong> <strong>Biological</strong> <strong>Defense</strong> <strong>Program</strong> Date: April 2013<br />

Appropriation / Budget Activity / Budget Sub Activity:<br />

0300D: Procurement, <strong>Defense</strong>-Wide / BA 03: <strong>Chemical</strong>/<br />

<strong>Biological</strong> <strong>Defense</strong> / BSA 1: CBDP<br />

P-1 Line Item Nomenclature:<br />

PA1600 - COLLECTIVE PROTECTION<br />

Models <strong>of</strong> Systems Affected: LHD class ships Type Modification: Force Protection Related RDT&E PEs:<br />

Manufacturer Information: Collective Protection System Amphibious Backfit<br />

Manufacturer Name: TBD Manufacturer Location: TBD<br />

Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 10<br />

LI PA1600 - COLLECTIVE PROTECTION UNCLASSIFIED<br />

<strong>Chemical</strong> <strong>and</strong> <strong>Biological</strong> <strong>Defense</strong> <strong>Program</strong> Page 5 <strong>of</strong> 31 P-1 Line #93<br />

Modification Nomenclature<br />

(Modification Number - Modification<br />

Title):<br />

JN0014 - Collective Protection System<br />

Amphibious Backfit<br />

Dates FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018<br />

Contract Dates Sep 2014<br />

Delivery Dates May 2015<br />

Installation: Collective Protection System Amphibious Backfit Method <strong>of</strong> Implementation: Alteration Installation Teams (AITs). Installation Name:<br />

Installation Cost<br />

Prior Years FY 2012 FY 2013<br />

Qty (Each) /<br />

Total Cost ($ M )<br />

Qty (Each) /<br />

Total Cost ($ M )<br />

Qty (Each) /<br />

Total Cost ($ M )<br />

FY 2014<br />

Base<br />

Qty (Each) /<br />

Total Cost ($ M )<br />

FY 2014<br />

OCO<br />

Qty (Each) /<br />

Total Cost ($ M )<br />

FY 2014<br />

Total FY 2015 FY 2016 FY 2017 FY 2018<br />

Qty (Each) /<br />

Total Cost ($ M )<br />

Qty (Each) /<br />

Total Cost ($ M )<br />

Qty (Each) /<br />

Total Cost ($ M )<br />

Qty (Each) /<br />

Total Cost ($ M )<br />

Qty (Each) /<br />

Total Cost ($ M )<br />

To<br />

Complete Total<br />

Qty (Each) /<br />

Total Cost ($ M )<br />

Qty (Each) /<br />

Total Cost ($ M )<br />

All Prior Years 54 / 64.800 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 54 / 64.800<br />

FY 2012 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / -<br />

FY 2013 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / -<br />

FY 2014 - / - - / - - / - 4 / 5.200 - / - 4 / 5.200 - / - - / - - / - - / - - / - 4 / 5.200<br />

FY 2015 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / -<br />

FY 2016 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / -<br />

FY 2017 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / -<br />

FY 2018 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / -<br />

To Complete 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / -<br />

Total 54 / 64.800 - / - - / - 4 / 5.200 - / - 4 / 5.200 - / - - / - - / - - / - - / - 58 / 70.000<br />

Installation Schedule<br />

FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018<br />

APY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC Tot<br />

In 28 - - - - - - - 4 - - - - - - - - - - - - - - - - - - - - - 32<br />

Out 28 - - - - - - - - - - 4 - - - - - - - - - - - - - - - - - - 32<br />

Footnotes:<br />

(1) Prior Years funding includes costs associated with <strong>the</strong> previous installation <strong>of</strong> protected spaces on two additional Navy amphibious ship classes. The L<strong>and</strong>ing Ship Dock (LSD) had 12 zones installed on<br />

three ships <strong>and</strong> 14 zones were installed on five L<strong>and</strong>ing Helicopter Assault (LHA) ships.<br />