16.08.2013 Views

Chemical and Biological Defense Program - Office of the Under ...

Chemical and Biological Defense Program - Office of the Under ...

Chemical and Biological Defense Program - Office of the Under ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIED<br />

Exhibit P-5, Cost Analysis: PB 2014 <strong>Chemical</strong> <strong>and</strong> <strong>Biological</strong> <strong>Defense</strong> <strong>Program</strong> Date: April 2013<br />

Appropriation / Budget Activity / Budget Sub Activity:<br />

0300D: Procurement, <strong>Defense</strong>-Wide / BA 03: <strong>Chemical</strong>/<br />

<strong>Biological</strong> <strong>Defense</strong> / BSA 1: CBDP<br />

Cost Elements<br />

(† indicates <strong>the</strong><br />

presence <strong>of</strong> a P-5A)<br />

Gross Weapon System<br />

Cost<br />

Cost Elements<br />

(† indicates <strong>the</strong><br />

presence <strong>of</strong> a P-5A)<br />

Hardware Cost<br />

Recurring Cost<br />

Prior/Future combined<br />

efforts<br />

† M4A1 JCAD -<br />

FRP - M4A1 JCAD<br />

Hardware (Army<br />

Baseline)<br />

† M4A1 JCAD -<br />

FRP - M4A1 JCAD -<br />

Hardware<br />

ID Unit Cost<br />

CD ($ K )<br />

ID Unit Cost<br />

CD ($ K )<br />

P-1 Line Item Nomenclature:<br />

GP2000 - CONTAMINATION AVOIDANCE<br />

LI GP2000 - CONTAMINATION AVOIDANCE UNCLASSIFIED<br />

<strong>Chemical</strong> <strong>and</strong> <strong>Biological</strong> <strong>Defense</strong> <strong>Program</strong> Page 29 <strong>of</strong> 60 P-1 Line #94<br />

Item Nomenclature (Item Number - Item<br />

Name, DODIC):<br />

JF0100 - JOINT CHEMICAL AGENT<br />

DETECTOR (JCAD)<br />

All Prior Years FY 2012 FY 2013 FY 2014 Base FY 2014 OCO FY 2014 Total<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

189.923 40.077 12.404 41.684 - 41.684<br />

FY 2015 FY 2016 FY 2017 FY 2018 To Complete Total Cost<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

Quantity<br />

(Each)<br />

- - 41.724 - - 42.671 - - 43.804 - - -<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

Quantity<br />

(Each)<br />

Quantity<br />

(Each)<br />

Continuing Continuing<br />

- - - - - - - - - - - - - - - - 1,997 11.976<br />

- - - - - - - - - - - - - - - - 16,109 101.033<br />

Total Recurring Cost 41.724 42.671 43.804 - Continuing Continuing<br />

Total Hardware Cost 41.724 42.671 43.804 - Continuing Continuing<br />

Support Cost<br />

Engineering Support<br />

(Gov't)<br />

System Fielding Support<br />

(Gov't) (First Article Test<br />

(FAT), Total Package<br />

Fielding, First Destinat...<br />

<strong>Program</strong> Management<br />

Support<br />

- - - - - - - - - - - - - - - - - 12.505<br />

- - - - - - - - - - - - - - - - - 9.868<br />

- - - - - - - - - - - - - - - - - 13.043<br />

Total Support Cost - - - - - 35.416<br />

Gross Weapon System<br />

Cost<br />

41.724 42.671 43.804 -<br />

Continuing Continuing<br />

P-5 Remarks:<br />

The JCAD program employs an incremental acquisition strategy to develop a miniaturized, rugged, <strong>and</strong> portable point chemical agent detector that automatically <strong>and</strong> simultaneously detects, identifies <strong>and</strong><br />

alerts in <strong>the</strong> presence <strong>of</strong> nerve, blister, <strong>and</strong> blood chemical warfare agents. The M4 JCAD entered full rate production in September 2008 <strong>and</strong> were procured through FY10. The M4A1 reduces operations <strong>and</strong><br />

sustainment costs to <strong>the</strong> Warfighter <strong>and</strong> obtains many <strong>of</strong> <strong>the</strong> objective values in <strong>the</strong> JCAD Increment I CPD. Production <strong>of</strong> <strong>the</strong> M4A1 began April FY11. JCAD will be used for wheeled vehicles, st<strong>and</strong> alone,<br />

<strong>and</strong> individual Soldier applications. The M4 JCAD will replace <strong>the</strong> M8A1 <strong>and</strong> <strong>the</strong> M22 Automatic <strong>Chemical</strong> Agent Alarms (ACAA/ACADA). The M4A1 may also replace <strong>the</strong> <strong>Chemical</strong> Agent Monitor (CAM) <strong>and</strong><br />

Improved <strong>Chemical</strong> Agent Monitor (ICAM) <strong>and</strong> o<strong>the</strong>r legacy systems currently used by <strong>the</strong> individual Services. These funds also support a Lifecycle Replacement (LR) for <strong>the</strong> Navy's Improved Point Detection<br />

System (IPDS). The MK26 Mod 1 Improved (<strong>Chemical</strong> Agent) Point Detection System Lifecycle Replacement (IPDS-LR) provides automatic point detection, classification, <strong>and</strong> warning when <strong>the</strong>re are chemical<br />

Total<br />

Cost<br />

($ M )<br />

Total<br />

Cost<br />

($ M )<br />

125

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!