UNCLASSIFIED<br />
Exhibit P-3A, Individual Modification: PB 2014 <strong>Chemical</strong> <strong>and</strong> <strong>Biological</strong> <strong>Defense</strong> <strong>Program</strong> Date: April 2013<br />
Appropriation / Budget Activity / Budget Sub Activity:<br />
0300D: Procurement, <strong>Defense</strong>-Wide / BA 03: <strong>Chemical</strong>/<br />
<strong>Biological</strong> <strong>Defense</strong> / BSA 1: CBDP<br />
P-1 Line Item Nomenclature:<br />
PA1600 - COLLECTIVE PROTECTION<br />
Models <strong>of</strong> Systems Affected: LHD class ships Type Modification: Force Protection Related RDT&E PEs:<br />
Resource Summary<br />
Prior<br />
Years FY 2012 FY 2013 #<br />
FY 2014<br />
Base<br />
FY 2014<br />
OCO ##<br />
FY 2014<br />
Total FY 2015 FY 2016 FY 2017 FY 2018<br />
LI PA1600 - COLLECTIVE PROTECTION UNCLASSIFIED<br />
<strong>Chemical</strong> <strong>and</strong> <strong>Biological</strong> <strong>Defense</strong> <strong>Program</strong> Page 3 <strong>of</strong> 31 P-1 Line #93<br />
Modification Nomenclature<br />
(Modification Number - Modification<br />
Title):<br />
JN0014 - Collective Protection System<br />
Amphibious Backfit<br />
To<br />
Complete Total<br />
Procurement Quantity (Units in Each) - - - - - - - - - - - -<br />
Gross/Weapon System Cost ($ in Millions) 153.063 - 1.620 16.841 - 16.841 - - - - - 171.524<br />
Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - -<br />
Net Procurement (P1) ($ in Millions) 153.063 - 1.620 16.841 - 16.841 - - - - - 171.524<br />
Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - -<br />
Total Obligation Authority ($ in Millions) 153.063 - 1.620 16.841 - 16.841 - - - - - 171.524<br />
(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)<br />
Initial Spares ($ in Millions) - - - - - - - - - - - -<br />
Gross/Weapon System Unit Cost<br />
(Units in Thous<strong>and</strong>s)<br />
# FY 2013 <strong>Program</strong> is from <strong>the</strong> FY 2013 President's Budget, submitted February 2012<br />
## The FY 2014 OCO Request will be submitted at a later date<br />
- - - - - - - - - - - -<br />
Description:<br />
The CPS will be installed on LHD class ships (1-8) in <strong>the</strong> Combat Information Center (CIC), two medical spaces, <strong>and</strong> a casualty decontamination area. CPS Backfit efforts will include ship surveys, engineering<br />
design analysis, detail design SIDs, development <strong>of</strong> modular installation packages, procurement <strong>of</strong> hardware, logistic warehousing <strong>and</strong> staging, <strong>and</strong> installation via Alteration Installation Teams (AITs).<br />
Procurement <strong>of</strong> government furnished equipment (GFE) is required. The CPS Backfit installation process is designed to maximize flexibility in procuring, receiving, warehousing, <strong>and</strong> assembling <strong>the</strong> necessary<br />
material <strong>and</strong> equipment to meet <strong>the</strong> challenges associated with changing ship availabilities. Each quantity denotes a protected zone.<br />
Note: Prior Years funding includes costs associated with <strong>the</strong> previous installation <strong>of</strong> protected spaces on two additional Navy amphibious ship classes. The L<strong>and</strong>ing Ship Dock (LSD) had 12 zones installed on<br />
three ships <strong>and</strong> 14 zones were installed on five L<strong>and</strong>ing Helicopter Assault (LHA) ships.<br />
Development Status/Major Development Milestones<br />
Date Title Description<br />
Sep 2014 LHD-8 (USS MAKIN ISLAND)<br />
67