16.08.2013 Views

Chemical and Biological Defense Program - Office of the Under ...

Chemical and Biological Defense Program - Office of the Under ...

Chemical and Biological Defense Program - Office of the Under ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIED<br />

Exhibit P-5, Cost Analysis: PB 2014 <strong>Chemical</strong> <strong>and</strong> <strong>Biological</strong> <strong>Defense</strong> <strong>Program</strong> Date: April 2013<br />

Appropriation / Budget Activity / Budget Sub Activity:<br />

0300D: Procurement, <strong>Defense</strong>-Wide / BA 03: <strong>Chemical</strong>/<br />

<strong>Biological</strong> <strong>Defense</strong> / BSA 1: CBDP<br />

Cost Elements<br />

(† indicates <strong>the</strong><br />

presence <strong>of</strong> a P-5A)<br />

Production Acceptance<br />

Test<br />

ID Unit Cost<br />

CD ($ K )<br />

P-1 Line Item Nomenclature:<br />

GP1000 - INDIVIDUAL PROTECTION<br />

LI GP1000 - INDIVIDUAL PROTECTION UNCLASSIFIED<br />

<strong>Chemical</strong> <strong>and</strong> <strong>Biological</strong> <strong>Defense</strong> <strong>Program</strong> Page 10 <strong>of</strong> 21 P-1 Line #90<br />

Item Nomenclature (Item Number - Item<br />

Name, DODIC):<br />

JI0003 - JOINT SERVICE GENERAL<br />

PURPOSE MASK (JSGPM)<br />

All Prior Years FY 2012 FY 2013 FY 2014 Base FY 2014 OCO FY 2014 Total<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

- - 3.534 - - 0.500 - - 0.500 - - 0.830 - - - - - 0.830<br />

Total Support Cost 42.102 19.755 14.576 29.774 - 29.774<br />

Gross Weapon System<br />

Cost<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ K )<br />

290.874 71.214 48.466 77.343 - 77.343<br />

P-5 Remarks:<br />

The Joint Service General Purpose Mask (JSGPM) is a lightweight, protective Nuclear <strong>Biological</strong> <strong>Chemical</strong> (NBC) mask system. It incorporates state-<strong>of</strong>-<strong>the</strong>-art technology to protect <strong>the</strong> U.S. Joint Forces from<br />

anticipated threats. The JSGPM provides above-<strong>the</strong>-neck, head/eye/respiratory protection against <strong>Chemical</strong> <strong>and</strong> <strong>Biological</strong> (CB) agents, radioactive particles, <strong>and</strong> Toxic Industrial Materials (TIMs). The mask<br />

design is optimized to minimize impact on <strong>the</strong> wearer's performance, <strong>and</strong> to maximize its ability to interface with fielded <strong>and</strong> future Joint Service equipment <strong>and</strong> protective clothing. The JSGPM mask system<br />

replaces <strong>the</strong> M40/M42 series <strong>of</strong> masks for Army <strong>and</strong> Marine ground <strong>and</strong> combat vehicle operations <strong>and</strong> <strong>the</strong> MCU-2/P series for Air Force <strong>and</strong> Navy ground <strong>and</strong> shipboard applications. In addition, <strong>the</strong> JSGPM<br />

replaces <strong>the</strong> M45 mask in <strong>the</strong> L<strong>and</strong> Warrior program. This can significantly reduce <strong>the</strong> number <strong>of</strong> masks that will have to be logistically supported by <strong>the</strong> Department <strong>of</strong> <strong>Defense</strong>. The M50 is <strong>the</strong> ground/ship<br />

version <strong>of</strong> <strong>the</strong> JSGPM. The M51 is <strong>the</strong> combat vehicle crewman version <strong>of</strong> <strong>the</strong> JSGPM. The M53 is <strong>the</strong> special operation version <strong>of</strong> <strong>the</strong> JSGPM.<br />

Justification: FY14 funds support procurement <strong>of</strong> 11,229 JSGPM Combat Vehicle Crewman (CVC) (M-51) <strong>and</strong> 174,246 JSGPM Ground/Ship (M-50) masks.<br />

RDT&E Code B Item: 0603884BP/Proj IP4; 0604384BP/Proj IP5; 0607384BP/Proj IP7<br />

IP4/JSGPM: RDT&E FY11 <strong>and</strong> Prior - 26.490M; FY13 - 1.102M; FY14 - 2.708M; FY15 - 3.906M; FY16 - 0.300M; FY17 - 0.300M<br />

IP5/JSGPM: RDT&E FY11 <strong>and</strong> Prior - 43.262M; FY13 - 2.004M; FY14 - 2.005M; FY15 - 1.003M; FY16 - 1.990M; FY17 - 1.990M<br />

IP7/JSGPM: RDT&E ; FY14 - 0.500M; FY15 - 2.501M; FY16 - 1.490M; FY17 - 1.490M; FY18 - 1.490M<br />

DEVELOPMENT/TEST STATUS AND MAJOR MILESTONES<br />

JSGPM - Filter Qualification Testing (Apr 2010 to Jan 2011)<br />

JSGPM - ARPI Class Based Analysis: Jan 2011<br />

JSGPM - ARPI Down-Select: Aug 2011<br />

JSGPM - ARPI Advanced Design Transition Assessments (Jan 2011 to Jul 2011)<br />

JSGPM - ARPI Method Verification (Jan 2011 to Jul 2011)<br />

JSGPM - ARPI Integration Testing (Jan 2012 to Jul 2012)<br />

JSGPM - TIC Filter TECH Transition: Sep 2012<br />

JSGPM - ARPI TD Contract Award: Nov 2012<br />

JSGPM - TIC Prototype Development (JSTO Technology 1) (Jan 2013 to May 2014)<br />

JSGPM - TIC Filter Sorbent Evaluation: Jul 2011<br />

JSGPM - TIC Filter Testing (JSTO Technology 1) (Apr 2014 to Dec 2014)<br />

JSGPM - Prototype Development (JSTO Technology 2) (Nov 2014 to Sep 2016)<br />

JSGPM - Prototype Testing (JSTO Technology 2) (Nov 2016 to Jun 2017)<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!