! Take the frame out of recess and drill anchor holes. Start vertically to about ½”<br />
depth, then slowly turn to a 45° angle.<br />
Figure 10 - Drilling Frame Anchor Holes123-429-900-970.jpg<br />
! Clean frame recess and anchor holes with compressed air. Dry with a propane<br />
gas burner if necessary. The surface must be dry and clean. Epoxy will only<br />
adhere to dry and clean rock, concrete, or asphalt surface.<br />
Figure 11 - Drying Recess with Propane123-429-901-110.jpg<br />
14<br />
M&E Vendor Documents<br />
Control Systems<br />
Section 9.11.3<br />
Page 18 of 36