21.08.2013 Views

Installation Instructions Stationary Weighpad_ELWC - WIM

Installation Instructions Stationary Weighpad_ELWC - WIM

Installation Instructions Stationary Weighpad_ELWC - WIM

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

! When epoxy has set after approximately 30-60 minutes (refer to E–Bond epoxy<br />

curing chart in the appendix), remove leveling aids, remove duct tape, and clean<br />

frames. Grinding may be necessary to remove excess epoxy.<br />

Do not use the grinder to clean epoxy on or near the mounting bolts.<br />

Figure 17 - Grinding Frame Clean 123-429-901-020.jpg<br />

! Make electrical ground connections with #8 bare copper wire UNDERNEATH<br />

the frame at the provided ¼” bolts between frame and cable conduit.<br />

20<br />

M&E Vendor Documents<br />

Control Systems<br />

Section 9.11.3<br />

Page 24 of 36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!