Installation Instructions Stationary Weighpad_ELWC - WIM
Installation Instructions Stationary Weighpad_ELWC - WIM
Installation Instructions Stationary Weighpad_ELWC - WIM
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
! When epoxy has set after approximately 30-60 minutes (refer to E–Bond epoxy<br />
curing chart in the appendix), remove leveling aids, remove duct tape, and clean<br />
frames. Grinding may be necessary to remove excess epoxy.<br />
Do not use the grinder to clean epoxy on or near the mounting bolts.<br />
Figure 17 - Grinding Frame Clean 123-429-901-020.jpg<br />
! Make electrical ground connections with #8 bare copper wire UNDERNEATH<br />
the frame at the provided ¼” bolts between frame and cable conduit.<br />
20<br />
M&E Vendor Documents<br />
Control Systems<br />
Section 9.11.3<br />
Page 24 of 36