! Mix the portland cement, somewhat dry, and build cement walls. The walls are<br />

only used to keep epoxy in place after pouring. The frame can be used for<br />

leveling.<br />

Figure 13 - Creating Cement Walls 123-429-900-980.jpg<br />

! Remove excessive concrete and other loose debris in the bearing area and<br />

clean the bearing area with compressed air and/or vacuum cleaner. This step<br />

is very important as any debris will reduce the bonding effect.<br />

! Check the bottom of the frame. Remove any debris which might adhere to the<br />

bituminous coating.<br />

! Seal off ends of cable and drain conduits with duct tape.<br />

! Attach #8 solid copper bonding wire(s) to the frame.<br />

! Set frame close to the recess.<br />

! When working with epoxy resin, wear appropriate protective clothing. Note the<br />

following important points:<br />

” It is important to remember that water is an enemy of all epoxy resin<br />

adhesives. Therefore, the installation and in particular the support areas<br />

of the frames and anchor holes must be dry.<br />

16<br />

M&E Vendor Documents<br />

Control Systems<br />

Section 9.11.3<br />

Page 20 of 36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!