! Mix the portland cement, somewhat dry, and build cement walls. The walls are<br />
only used to keep epoxy in place after pouring. The frame can be used for<br />
leveling.<br />
Figure 13 - Creating Cement Walls 123-429-900-980.jpg<br />
! Remove excessive concrete and other loose debris in the bearing area and<br />
clean the bearing area with compressed air and/or vacuum cleaner. This step<br />
is very important as any debris will reduce the bonding effect.<br />
! Check the bottom of the frame. Remove any debris which might adhere to the<br />
bituminous coating.<br />
! Seal off ends of cable and drain conduits with duct tape.<br />
! Attach #8 solid copper bonding wire(s) to the frame.<br />
! Set frame close to the recess.<br />
! When working with epoxy resin, wear appropriate protective clothing. Note the<br />
following important points:<br />
” It is important to remember that water is an enemy of all epoxy resin<br />
adhesives. Therefore, the installation and in particular the support areas<br />
of the frames and anchor holes must be dry.<br />