Detailed Savings Analysis (Continued)<br />

Revised<br />

Thermal<br />

No Control No Control<br />

<br />

original Thermal Change Change<br />

Possible AHU Thermal<br />

reheat reheat Therms Indirect $ Direct $ Direct kWh Setpoint reheat<br />

OR<br />

(therms) (therms) Saved Savings/yr Savings/yr Savings/yr Adjustment (F) (therms)<br />

OR 1 -499.6 -602.0 102.4 $81.93 $47.44 527 1.38 -525.7<br />

OR 2 -384.4 -453.6 69.2 $55.34 $56.81 631 1.18 -425.5<br />

OR 3 -427.0 -506.8 79.8 $63.86 $56.81 631 1.24 -464.7<br />

OR 4 -474.9 -566.7 91.8 $73.44 $56.81 631 1.32 -508.8<br />

Total 343.2 $274.57 $217.86 2,421 -1,925<br />

Do Nothing Total Annual Energy Savings: $492.43<br />

Savings Summary per Year<br />

Do Nothing Modify AHU Setpoint<br />

Direct Indirect Total Direct Indirect Total<br />

kWh 2,421 0 2,421 2,421 22,749 25,170<br />

Therms 0 343 343 0 139 139<br />

$ $217.86 $274.57 $492.43 $217.86 $2,158.54 $2,376.40<br />

PG&E Incentive $121 $275 $396 $121 $3,296 $3,417<br />

*This model is conservative because other areas would also have savings due to less reheat<br />

Copy of 2 Petaulma OR Loads Project No.09104<br />