Operating Room Lighting Replacement<br />

The operating theaters are the defining load on the air handlers, which dictate the setpoint of the supplied air of the air<br />

handler. If the operators adjust the setpoint of the supplied air to compensate for the drop in load there will be both<br />

electrical and thermal savings; an average of 0.69 kWh and .04 therms/direct kWh of reduction. Tables 3 and 4<br />

illustrate these savings. Petaluma’s results by OR are available in Appendix II, as well as the full calculations &<br />

supporting documentation. Kaiser’s calculations and supporting documentation is available in Appendix I. Note that<br />

the basis of the positive value without a controls change for Kaiser’s OR 6 is that the currently supplied cooling for that<br />

OR is greater than the supplied cooling.<br />

Table 3: Savings Summary<br />

Kaiser Petaluma Valley Hospital<br />

Do Nothing Modify AHU Setpoint Do Nothing Modify AHU Setpoint<br />

Direct Indirect Total Direct Indirect Total Direct Indirect Total Direct Indirect Total<br />

11,67<br />

11,67 11,67<br />

11,67<br />

25,17<br />

kWh 3 0 3 3 0 3 2,421 0 2,421 2,421 22,749 0<br />

Therms 0 -1,248 -1,248 0 -1,248 -1,248 0 343 343 0 139 139<br />

$1,05<br />

$1,05<br />

$2,37<br />

$ 1 -$874 -$874 1 -$874 $177 $218 $276 $492 $218 $2,159 6<br />

PG&E<br />

$3,41<br />

Incentive $584 $0 $584 $584 $0 $584 $121 $275 $396 $121 $3,296 7<br />

*These model are conservative because other areas would also have savings due to less reheat. PG&E does not pay an<br />

incentive for indirect savings.<br />

Table 4: Kaiser Unit Based Energy Savings<br />

OR CFM<br />

No<br />

Control<br />

Change<br />

Therms<br />

Saved<br />

/Year<br />

No<br />

Control<br />

Change<br />

Indirect $<br />

Savings<br />

/Year<br />

Direct<br />

kWh $<br />

Savings<br />

/Year<br />

Direct<br />

kWh<br />

Savings<br />

/Year<br />

Revised<br />

Therms<br />

/Year After<br />

Controls<br />

Modification<br />

Controls<br />

Changed<br />

Indirect<br />

$<br />

Savings<br />

/Year 1<br />

Simple<br />

Payback –<br />

Early<br />

Retirement,<br />

in years<br />

Simple<br />

Payback<br />

–<br />

Incr.<br />

Cost, in<br />

years<br />

1 945 -23.9 -$16.73 $105.75 1,175 24.6 $56.89 124 32.0<br />

2 1,231 -124.1 -$86.85 $44.06 490 40.3 $93.07 297 76.9<br />

3 1,081 -118.7 -$83.10 $79.32 881 16.1 $37.24 165 42.7<br />

4 2,166 -342.8 -$239.99 $105.75 1,175 57.5 $132.85 124 32.0<br />

5 2,140 -149.0 -$104.31 $133.29 1,481 43.1 $99.70 98 25.4<br />

6 1,668 84.5 $59.14 $133.29 1,481 19.7 $45.51 98 25.4<br />

7 1,940 -47.2 -$33.06 $133.29 1,481 33.2 $76.74 98 25.4<br />

8 1,249 -113.7 -$79.57 $53.24 592 36.8 $85.08 246 63.6<br />

9 1,162 -102.4 -$71.69 $79.32 881 20.1 $46.54 165 42.7<br />

10 1,358 -182.0 -$127.38 $66.10 734 76.1 $175.82 198 51.3<br />

11 1,036 -21.8 -$15.28 $53.24 592 56.7 $131.05 246 63.6<br />

12 1,096 -106.7 -$74.66 $63.89 710 56.4 $130.35 205 53.0<br />

Total 17,072 -1,247.8 -$873.49 $1,050 11,673 481 $1,110.84<br />

1<br />

Both thermal and kWh<br />

Salas O’Brien Engineers | expect a difference | Project No. 09104<br />