15.10.2013 Views

Road Racing FIM Superbike & Supersport World Championships

Road Racing FIM Superbike & Supersport World Championships

Road Racing FIM Superbike & Supersport World Championships

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• New range of engine prefix numbers<br />

• New range of frame prefix numbers<br />

If more than 2 items of the above need to be updated durind the machine’s<br />

life, a new homologation will be necessary<br />

1.5.1 Update specifications<br />

The <strong>FIM</strong> can grant a parts and product update differing from above rule,<br />

purely for the scope of production cost saving provided that following<br />

provisions are kept:<br />

• Crankcase is not lighter* than the original homologated unit and the<br />

positions of crankshaft, gearbox, frame attachments, main shafts and<br />

position of cylinders remains unchanged (*apart casting method for<br />

mass production).<br />

• Cylinder(s) have same inner geometrical dimensions including sleeve<br />

and are no lighter than the original unit<br />

• Cylinder head: combustion chamber shape and volume, valve and<br />

camshaft locations as well as intake and exhaust ports locations and<br />

shape remain unchanged<br />

• Crankshaft: same stroke and not lighter than original homologated<br />

unit<br />

• Connecting rods: same base material (i.e. steel) and not lighter then<br />

original homologated unit<br />

If more than 2 items of the above need to be updated during the machine’s<br />

life, a new homologation will be necessary.<br />

1.5.2 HOMOLOGATION OF PARTS AND PRODUCT UPDATE<br />

• Product updates on parts other than those stated in Article 1.5, such as<br />

the fairing or wheels require a homologation update.<br />

• The manufacturer must send a notice to the <strong>FIM</strong> CTI Secretariat<br />

requesting for a homologation update not later than 30 days before the<br />

first race in which the model containing new parts will compete.<br />

• With the formal notice, the manufacturer is required to send the 1,<br />

2 and 3 homologation forms, together with all relating documentation<br />

about the parts and product update (the drawings of the old and<br />

new products/parts, etc.) including a statement with the VIN-Number<br />

pertinent to the updated parts and product, to the <strong>FIM</strong> CTI Secretariat,<br />

both in paper and electronic form.<br />

153

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!