16.10.2013 Views

“Finn-Power is the only machine builder that took a position on the ...

“Finn-Power is the only machine builder that took a position on the ...

“Finn-Power is the only machine builder that took a position on the ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CUSTOMER PROFILE<br />

Laser Automati<strong>on</strong> Sparks Productivity<br />

at Great Lakes Manufacturing, Inc.<br />

When Great Lakes Manufacturing,<br />

Inc., Corry, PA, began operati<strong>on</strong>s<br />

in 1998 as a prec<str<strong>on</strong>g>is</str<strong>on</strong>g>i<strong>on</strong> sheet<br />

metal fabricati<strong>on</strong> shop, its original functi<strong>on</strong> was<br />

to be a supplier to s<str<strong>on</strong>g>is</str<strong>on</strong>g>ter company Great Lakes<br />

Case & Cabinet. However, th<str<strong>on</strong>g>is</str<strong>on</strong>g> modest<br />

objective was met and dramatically exceeded<br />

thanks to a stellar performance by <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

company’s management and employees.<br />

“Currently, we have 102 employees and about<br />

60% of our business <str<strong>on</strong>g>is</str<strong>on</strong>g> for our s<str<strong>on</strong>g>is</str<strong>on</strong>g>ter company<br />

and 40% <str<strong>on</strong>g>is</str<strong>on</strong>g> for c<strong>on</strong>tract customers,” explains<br />

Robert Low<str<strong>on</strong>g>the</str<strong>on</strong>g>r, owner.<br />

According to Low<str<strong>on</strong>g>the</str<strong>on</strong>g>r, h<str<strong>on</strong>g>is</str<strong>on</strong>g> company’s<br />

philosophy of investment in people and in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

latest technology helped to make Great Lakes<br />

Manufacturing a leader in prec<str<strong>on</strong>g>is</str<strong>on</strong>g>i<strong>on</strong> sheet metal<br />

fabricati<strong>on</strong>. “Our manufacturing plant occupies<br />

over 90,000 square feet in prime locati<strong>on</strong> al<strong>on</strong>g<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> I-90 and I-79 corridors of northwestern<br />

Pennsylvania,” says Low<str<strong>on</strong>g>the</str<strong>on</strong>g>r. “We’ve tried to<br />

<str<strong>on</strong>g>positi<strong>on</strong></str<strong>on</strong>g> ourselves as <strong>on</strong>e of a handful of<br />

fabricators <str<strong>on</strong>g>that</str<strong>on</strong>g> have our level of capabilities.<br />

The latest technology combined with a<br />

commitment to lean manufacturing are <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

ways <str<strong>on</strong>g>that</str<strong>on</strong>g> we have attempted to differentiate<br />

ourselves,” Low<str<strong>on</strong>g>the</str<strong>on</strong>g>r c<strong>on</strong>tinues. “Automati<strong>on</strong>,<br />

robotics, informati<strong>on</strong> technology, and a high<br />

level of employee skill allow us to be<br />

competitive in a global ec<strong>on</strong>omy. In <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

past two years, we have invested more <str<strong>on</strong>g>that</str<strong>on</strong>g><br />

$3-milli<strong>on</strong> into our facility.”<br />

Part of <str<strong>on</strong>g>that</str<strong>on</strong>g> investment was earmarked for<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> procurement of a new laser in 2004. Fred<br />

Cooke, director of engineering /MIS, was<br />

chosen to search <str<strong>on</strong>g>the</str<strong>on</strong>g> marketplace for <str<strong>on</strong>g>the</str<strong>on</strong>g> latest<br />

laser technology. Cooke began <str<strong>on</strong>g>the</str<strong>on</strong>g> search during<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> sec<strong>on</strong>d quarter. “I began with some of <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

big traditi<strong>on</strong>al names in <str<strong>on</strong>g>the</str<strong>on</strong>g> laser industry,” he<br />

explains. “I v<str<strong>on</strong>g>is</str<strong>on</strong>g>ited several companies and<br />

thoroughly investigated <str<strong>on</strong>g>the</str<strong>on</strong>g> best lasers <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

market. I sent <str<strong>on</strong>g>the</str<strong>on</strong>g> same time study to each of<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g>se companies. I also came across <str<strong>on</strong>g>the</str<strong>on</strong>g> Finn-<br />

<str<strong>on</strong>g>Power</str<strong>on</strong>g> L6 Laser Work Center. Finn-<str<strong>on</strong>g>Power</str<strong>on</strong>g> was a<br />

name I first heard in Europe.<br />

“I sent <str<strong>on</strong>g>the</str<strong>on</strong>g> same time study to Finn-<str<strong>on</strong>g>Power</str<strong>on</strong>g>.<br />

When <str<strong>on</strong>g>the</str<strong>on</strong>g> time studies of <str<strong>on</strong>g>the</str<strong>on</strong>g> same nesting run<br />

came back, Finn-<str<strong>on</strong>g>Power</str<strong>on</strong>g>’s time was 60% faster<br />

than <str<strong>on</strong>g>the</str<strong>on</strong>g> next best time. It was a massive<br />

producti<strong>on</strong> improvement. We also received<br />

some parts back so we were able to check <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

Great Lakes Manufacturing uses technology, like <str<strong>on</strong>g>the</str<strong>on</strong>g> Finn-<br />

<str<strong>on</strong>g>Power</str<strong>on</strong>g> laser and automated material handling equipment,<br />

to differentiate itself from competitors.<br />

edge quality and everything worked out very<br />

well. We selected <str<strong>on</strong>g>the</str<strong>on</strong>g> L6 with load/unload and a<br />

10-shelve storing tower which was installed in<br />

December, 2004.”<br />

The Finn-<str<strong>on</strong>g>Power</str<strong>on</strong>g> L6 Laser Work Center<br />

utilizes a flying optics/moving beam system<br />

driven by a linear drive motor system to achieve<br />

maximum speeds, even while cutting small<br />

notches or narrow c<strong>on</strong>tours.<br />

The L6 features a 4 kW fast axial flow CO 2<br />

laser. Cutting speeds up to 60 m/min<br />

(2.362" /min) are reached using nitrogen as<br />

cutting ass<str<strong>on</strong>g>is</str<strong>on</strong>g>t gas. The L6 can process sheet sizes<br />

“Over <str<strong>on</strong>g>the</str<strong>on</strong>g> last 1 1/2 years, we’ve had a heavy flow of lean<br />

manufacturing – we’re not batch manufacturing<br />

anymore. We are producing a lean flow with Finn-<br />

<str<strong>on</strong>g>Power</str<strong>on</strong>g> automati<strong>on</strong>.”<br />

up to 60" x 120" and up to 0.78" in thickness.<br />

Performance values include a <str<strong>on</strong>g>positi<strong>on</strong></str<strong>on</strong>g>ing speed<br />

of 11,811" /min., accelerati<strong>on</strong> over 2 g, and<br />

cutting speeds up to 2,363" /min. Unlike<br />

c<strong>on</strong>venti<strong>on</strong>al re<str<strong>on</strong>g>positi<strong>on</strong></str<strong>on</strong>g>ing, where straight line<br />

movements of <str<strong>on</strong>g>the</str<strong>on</strong>g> cutting head waste time,<br />

Finn-<str<strong>on</strong>g>Power</str<strong>on</strong>g> optimizes <str<strong>on</strong>g>the</str<strong>on</strong>g> cutting head<br />

movement with “Ping P<strong>on</strong>g” re<str<strong>on</strong>g>positi<strong>on</strong></str<strong>on</strong>g>ing. Th<str<strong>on</strong>g>is</str<strong>on</strong>g><br />

smooth and efficient transiti<strong>on</strong> translates to<br />

added producti<strong>on</strong> speeds – up to 1,000<br />

holes/min are now possible. The patented L6<br />

rigid frame design withstands all <str<strong>on</strong>g>the</str<strong>on</strong>g> forces of<br />

high-speed <str<strong>on</strong>g>positi<strong>on</strong></str<strong>on</strong>g>ing and provides a solid base<br />

for stable beam delivery optics.<br />

4<br />

Robert Low<str<strong>on</strong>g>the</str<strong>on</strong>g>r, owner (left) and Fred Cooke, director<br />

of engineering/MIS, report <str<strong>on</strong>g>that</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> L6 laser has<br />

allowed Great Lakes to fully embrace lean/flow<br />

manufacturing.<br />

Automati<strong>on</strong> <str<strong>on</strong>g>is</str<strong>on</strong>g> Key<br />

According to<br />

Cooke, automati<strong>on</strong><br />

was ano<str<strong>on</strong>g>the</str<strong>on</strong>g>r key<br />

reas<strong>on</strong> for choosing<br />

Finn-<str<strong>on</strong>g>Power</str<strong>on</strong>g>. “With<br />

o<str<strong>on</strong>g>the</str<strong>on</strong>g>r lasers, automati<strong>on</strong><br />

involved taking down an<br />

entire shelf of material and<br />

working with <str<strong>on</strong>g>that</str<strong>on</strong>g>,” reflects<br />

Cooke. “With <str<strong>on</strong>g>the</str<strong>on</strong>g> L6, we take<br />

down <strong>on</strong>e sheet at a time, so we<br />

can nest and kit parts. I can run<br />

a 13 gauge sheet and <str<strong>on</strong>g>the</str<strong>on</strong>g>n a sheet<br />

of 16 gauge and <str<strong>on</strong>g>the</str<strong>on</strong>g>n a sheet of<br />

aluminum…and build up kits <str<strong>on</strong>g>that</str<strong>on</strong>g>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!