Debris Management | 27<br />

Debris Management<br />

The <strong>Haiti</strong> earthquake produced an estimated 40 million m3 of debris. As a comparison, the 2004 tsunami<br />

in Aceh and Nias resulted in 5.8 million m3 of tsunami waste—and two years later, despite dedicated<br />

efforts, only about 1 million m3 had been cleared. The U.S. spent over US$3.7 billion clearing 76<br />

million m 3 of debris during the course of a year. These examples illustrate the challenges facing <strong>Haiti</strong><br />

as it seeks to balance the damage of the earthquake with the urgency of recovery.<br />

Debris cleanup requires prudent management.<br />

Debris can contain human remains, which need to<br />

be retrieved with dignity, and personal property,<br />

often the only assets survivors have left. Debris can<br />

provide raw materials for reconstruction—wood,<br />

metal, bricks, and concrete aggregate to build future<br />

structures and fill roads. Debris left by an earthquake<br />

may also be dangerous to the population<br />

and the environment because among recyclable<br />

materials, there could be pollutants and hazardous<br />

materials such as fuel, ammonia, pesticides, lead,<br />

heavy metals, medical waste, and asbestos.<br />

<strong>Haiti</strong> is currently facing two major challenges<br />

in Debris Management:<br />

■■<br />

How to best coordinate removal of debris during<br />

the recovery phase<br />

■■ How to manage such large quantities of debris<br />

given the urgency of reconstruction and livelihood<br />

needs.<br />

To save costs and coordinate efforts, a Post<br />

Disaster Debris Management Plan is generally<br />

recommended. Such a plan clarifies responsibilities,<br />

procedures, location of storage, and disposal<br />

sites as well as staff and equipment needs. i By contrast,<br />

weak initial planning can result in significant<br />

costs. Two examples, the Marmara <strong>Earthquake</strong><br />

(Turkey) and Aceh Tsunami, illustrate how:<br />

■■ The Marmara earthquake (1999) generated 35<br />

million m 3 of rubble. More than 90 percent of<br />

the original debris was potentially recyclable,<br />

but weak initial coordination and planning led<br />

to extensive dumping. As a result, the debris<br />

became commingled with soil, clothes, wood,<br />

and in some cases hazardous materials, requiring<br />

expensive secondary sorting to produce recyclable<br />

materials.<br />

■■<br />

3<br />

In Aceh, about 400,000 m of tsunami waste<br />

was initially dumped into rice fields, fish ponds,<br />

and other sites in order to clear residential areas.<br />

The Tsunami Waste Recovery Program had<br />

to spend about US$9 million, rent 60 trucks,<br />

and employ 1,500-2,000 workers to recover<br />

this waste.<br />

The most urgent procedures should be settled<br />

first. Agreement on a complete Debris Management<br />

Plan can take time—ranging <strong>from</strong> 1 to 1.5 months<br />

in the U.S. after Hurricane Katrina to close to 2 years<br />

in Aceh after the tsunami. The Government of <strong>Haiti</strong>