NORTH ACID AREA-CHROMATE<br />
CONCENTRATION POND, SF<strong>AAP</strong>-008<br />
SITE DESCRIPTION<br />
The North Acid Area is located in the northcentral<br />
portion of SF<strong>AAP</strong>. The Chromate Concentration<br />
Pond is known to have been located<br />
within the North Acid Area, but because the<br />
pond has been drained, its location remains uncertain.<br />
Reportedly, chromate was used as a<br />
corrosion inhibitor in the fixation process at the<br />
Nitrogen Fixation <strong>Plan</strong>t. This plant was located<br />
in the North Acid Area and was in operation<br />
between 1953 and 1954. It has been reported<br />
that when the plant was dismantled in 1958, the<br />
pond and surrounding ground became contaminated.<br />
In 1968, several cows died from drinking<br />
water in this area (USATHAMA, 1980; PRC,<br />
1990).<br />
Chromate salts from the neutralization process<br />
used to treat chromium sludge were reportedly<br />
stored in drums located in the magazine area<br />
(PRC, 1990). These salts proved non-hazardous,<br />
and SF<strong>AAP</strong> received state approval to dispose<br />
of the salts in an on-site landfill (SF<strong>AAP</strong>,<br />
1992). The risk assessment found that the primary<br />
risk drivers were hexavalent chromium in<br />
surface water and PAHs in surface soil.<br />
PROPOSED PLAN<br />
Additional investigation and removal work at<br />
this site will be performed under SF<strong>AAP</strong>-007.<br />
Five years of LTM will be performed.<br />
SUNFLOWER<br />
ARMY<br />
AMMUNITION<br />
PLANT<br />
INDICATES SITE LOCATION<br />
N<br />
IRP STATUS<br />
RRSE RATING:<br />
High<br />
CONTAMINANTS:<br />
Metals<br />
MEDIA OF CONCERN:<br />
Surface Water, Soil<br />
COMPLETED IRP PHASE:<br />
PA, RFA<br />
CURRENT IRP PHASE:<br />
RFI<br />
FUTURE IRP PHASE:<br />
LTM<br />
CONSTRAINED COST TO COM PLETE<br />
PHASE 2001 2002 2003 2004 2005 2006 2007+<br />
RI/FS 50<br />
IR A<br />
RD<br />
RA<br />
RAO<br />
LTM 21<br />
PROJECTED TOTAL: $71,000<br />
<strong>Sunflower</strong> <strong>AAP</strong> - <strong>Installation</strong> <strong>Action</strong> <strong>Plan</strong><br />
Site Descriptions - Page 18