F-LINE DITCHES, SF<strong>AAP</strong>-010<br />
SITE DESCRIPTION<br />
The F-Line Area is located in the east-central portion<br />
of SF<strong>AAP</strong>. The F-Line consisted of a blender house<br />
in which explosive propellant was received and<br />
blended with lead salicylate; rolled into sheets; slit<br />
and wound into carpet rolls; and extruded by large<br />
hydraulic presses into solid propellant grains. Any<br />
propellant that was on the floor was washed into the<br />
drain with the wastewater. Most of the effluents<br />
were then discharged, via unlined ditches, to settling<br />
ponds and eventually to Spoon and Kill Creeks; however,<br />
one group of the ditches discharged directly to a<br />
field adjacent to Spoon Creek. The F-line ditches<br />
were located on the east side of the F-Line press<br />
houses. Occasionally, propellant solids settled in<br />
these ditches before reaching the ponds. The ditches<br />
were used periodically from the early 1950s to 1971.<br />
Several ditches served as discharge points for runoff<br />
from storm drains along the streets in the area<br />
(USATHAMA, 1980; USAEHA, 1985b; USAEHA,<br />
1987; PRC, 1990).<br />
The draft RFI indicates nitroglycerin in soil at concentrations<br />
that exceed EPAs target risk range for<br />
carcinogenic risk. Lead was found at concentrations<br />
exceeding EPA and KDHE guidance values.<br />
The Final Corrective Measures Study has been completed<br />
and recommends soil remediation by excavation,<br />
stabilization and incineration. The stabilization<br />
study began in September, 1999.<br />
PROPOSED PLAN<br />
Approximately 5,000cy of soil will be removed by<br />
excavation, stabilization, and incineration will be performed.<br />
Five years of LTM will be conducted.<br />
SUNFLOWER<br />
ARMY<br />
AMMUNITION<br />
PLANT<br />
INDICATES SITE LOCATION<br />
N<br />
IRP STATUS<br />
RRSE RATING:<br />
High<br />
CONTAMINANTS:<br />
Metals, Solvents,<br />
Ordnance Compounds<br />
MEDIA OF CONCERN:<br />
Soil, Groundwater, Surface<br />
Water, Sediment<br />
COMPLETED IRP PHASE:<br />
PA, RFA, RFI, CMS, CMI<br />
CURRENT IRP PHASE:<br />
LTM<br />
FUTURE IRP PHASE:<br />
RC<br />
PHASE 2001 2002 2003 2004 2005 2006 2007+<br />
RI/FS<br />
IR A<br />
RD<br />
RA<br />
RAO<br />
CONSTRAINED COST TO COM PLETE<br />
LTM 22<br />
PROJECTED TOTAL: $22,000<br />
<strong>Sunflower</strong> <strong>AAP</strong> - <strong>Installation</strong> <strong>Action</strong> <strong>Plan</strong><br />
Site Descriptions - Page 20