14.11.2013 Views

Sunflower AAP - Installation Action Plan - GlobalSecurity.org

Sunflower AAP - Installation Action Plan - GlobalSecurity.org

Sunflower AAP - Installation Action Plan - GlobalSecurity.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FLUORESCENT TUBE WELL SF<strong>AAP</strong>-054<br />

SITE DESCRIPTION<br />

The fluorescent lamp disposal well/cistern is located<br />

in the northwestern portion of SF<strong>AAP</strong>, east<br />

of the NQ production area.<br />

The site consists of a well/cistern as part of an<br />

old, pre-SF<strong>AAP</strong> homestead. The well is 5 feet in<br />

diameter, about 12 feet deep and has a concrete<br />

wall. The well has been used as a fluorescent<br />

lamp bulb disposal pit. It is uncertain when this<br />

occurred, but is suspected to have taken place<br />

prior to 1976. The well is uncovered and full of<br />

water.<br />

A representative of the U.S. Army Center for<br />

Health Promotion and Preventive Medicine<br />

(CHPPM) visited the well site, collected soil and<br />

water samples and performed a relative risk site<br />

evaluation. The information will be used to determine<br />

the order in which corrective/remedial<br />

actions will be taken at SF<strong>AAP</strong>. This site was<br />

determined as having “medium” risk and reported<br />

by CHPPM in “Hazardous and Medical Waste<br />

Study No. 37-EF-9063-99” dated 5 November 1998.<br />

PROPOSED PLAN<br />

SUNFLOWER<br />

ARMY<br />

AMMUNITION<br />

PLANT<br />

INDICATES SITE LOCATION<br />

N<br />

The contents (sludge and debris) of one well will<br />

be excavated and disposed. Confirmatory sampling<br />

will be conducted.<br />

IRP STATUS<br />

RRSE RATING:<br />

Medium<br />

CONTAMINANTS:<br />

Mercury<br />

MEDIA OF CONCERN:<br />

Soil and groundwater<br />

COMPLETED IRP PHASE:<br />

PA/SI, IRA<br />

CURRENT IRP PHASE:<br />

RI/FS<br />

FUTURE IRP PHASE:<br />

RC<br />

PHASE 2001 2002 2003 2004 2005 2006 2007+<br />

RI/FS 12<br />

IR A<br />

RD<br />

RA<br />

RAO<br />

LTM<br />

CONSTRAINED COST TO COM PLETE<br />

PROJECTED TOTAL: $12,000<br />

<strong>Sunflower</strong> <strong>AAP</strong> - <strong>Installation</strong> <strong>Action</strong> <strong>Plan</strong><br />

Site Descriptions - Page 54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!