NITROCELLULOSE AREA DITCHES, SF<strong>AAP</strong>-025<br />

SITE DESCRIPTION<br />

The NC Area is located in the north central<br />

portion of SF<strong>AAP</strong>. NC is prepared by the reaction<br />

of cotton linters (cellulose) and a mixture<br />

of nitric and sulfuric acids. It is unclear when<br />

NC production was initiated at SF<strong>AAP</strong>; however,<br />

according to information concerning related<br />

SWMUs such as Pond A, NC was reportedly<br />

produced during two periods. The first<br />

lasted from 1942 to 1960, which included the<br />

time between World War II and the Korean War<br />

when most of the facilities on SF<strong>AAP</strong> were inactive.<br />

The second production period occurred<br />

between 1965 and 1971.<br />

Nitrocelluose and beryllium was detected in the<br />

soils during initial RFI activities. Elevated levels<br />

of manganese was detected in GW.<br />

SUNFLOWER<br />

ARMY<br />

AMMUNITION<br />

PLANT<br />

INDICATES SITE LOCATIONS<br />

N<br />

PROPOSED PLAN<br />

Additional RFI activities will be performed to<br />

fully define the extent of contamination. Remedial<br />

activities will include excavation, treatment<br />

and disposal of contaminated soil.<br />

IRP STATUS<br />

RRSE RATING:<br />

High<br />

CONTAMINANTS:<br />

Metals, nitrocellulose<br />

MEDIA OF CONCERN:<br />

Soil and groundwater<br />

COMPLETED IRP PHASE:<br />

RFA<br />

CURRENT IRP PHASE:<br />

RFI<br />

FUTURE IRP PHASE:<br />

CMS, DES, CMI, LTM<br />

CONSTRAINED COST TO COM PLETE<br />

PHASE 2001 2002 2003 2004 2005 2006 2007+<br />

RI/FS 50 70<br />

IR A<br />

RD 31<br />

RA 325<br />

RAO<br />

LTM 30<br />

PROJECTED TOTAL: $506,000<br />

<strong>Sunflower</strong> <strong>AAP</strong> -<strong>Installation</strong> <strong>Action</strong> <strong>Plan</strong><br />

Site Descriptions - Page 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!