NITROGUANIDINE PRODUCTION AREA (23) SUMPS, SF<strong>AAP</strong>-047<br />
SITE DESCRIPTION<br />
The NQ manufacturing facilities are located in<br />
the northwest corner of SF<strong>AAP</strong>. Construction<br />
of these facilities began in the late 1970s, and<br />
limited production began during 1981. During<br />
August 1984 the plant began production of NQ,<br />
producing approximately 4.9 million pounds in<br />
1985, and 7.7 million pounds in 1986. All of the<br />
buildings had associated sumps which received<br />
the wastewater generated in the NQ Area as a<br />
result of various operations including<br />
washdowns, spills, runoff, and non-contact operations<br />
such as cooling water and steam condensate.<br />
The wastewater may have been acidic,<br />
and may potentially have contained contaminants<br />
such as NQ and GN, as well as raw process<br />
materials or intermediates of the NQ process.<br />
Initial RFI results indicate elevated levels of nitrates<br />
in GW. High levels of sodium was also<br />
detected.<br />
SUNFLOWER<br />
ARMY<br />
AMMUNITION<br />
PLANT<br />
INDICATES SITE LOCATION<br />
N<br />
PROPOSED PLAN<br />
A CMS will be completed, including the installation<br />
of an interceptor trench (french drain) to collect<br />
contaminated (nitrates) GW. The water will<br />
be used for irrigation, if possible. Twenty-three<br />
sumps will be excavated and backfilled with clean<br />
soil.<br />
IRP STATUS<br />
RRSE RATING:<br />
High<br />
CONTAMINANTS:<br />
Metals, Ordnance Compounds<br />
MEDIA OF CONCERN:<br />
Soil, Groundwater<br />
COMPLETED IRP PHASE:<br />
PA, RFA<br />
CURRENT IRP PHASE:<br />
RFI<br />
FUTURE IRP PHASE:<br />
CMS, CMI, CM(O)<br />
CONSTRAINED COST TO COM PLETE<br />
PHASE 2001 2002 2003 2004 2005 2006 2007+<br />
RI/FS 105 80<br />
IR A<br />
RD 132<br />
RA 1260<br />
RAO<br />
LTM 6 6 6 162<br />
PROJECTED TOTAL: $1,757,000<br />