NITROGUANIDINE PRODUCTION AREA (23) SUMPS, SF<strong>AAP</strong>-047<br />

SITE DESCRIPTION<br />

The NQ manufacturing facilities are located in<br />

the northwest corner of SF<strong>AAP</strong>. Construction<br />

of these facilities began in the late 1970s, and<br />

limited production began during 1981. During<br />

August 1984 the plant began production of NQ,<br />

producing approximately 4.9 million pounds in<br />

1985, and 7.7 million pounds in 1986. All of the<br />

buildings had associated sumps which received<br />

the wastewater generated in the NQ Area as a<br />

result of various operations including<br />

washdowns, spills, runoff, and non-contact operations<br />

such as cooling water and steam condensate.<br />

The wastewater may have been acidic,<br />

and may potentially have contained contaminants<br />

such as NQ and GN, as well as raw process<br />

materials or intermediates of the NQ process.<br />

Initial RFI results indicate elevated levels of nitrates<br />

in GW. High levels of sodium was also<br />

detected.<br />

SUNFLOWER<br />

ARMY<br />

AMMUNITION<br />

PLANT<br />

INDICATES SITE LOCATION<br />

N<br />

PROPOSED PLAN<br />

A CMS will be completed, including the installation<br />

of an interceptor trench (french drain) to collect<br />

contaminated (nitrates) GW. The water will<br />

be used for irrigation, if possible. Twenty-three<br />

sumps will be excavated and backfilled with clean<br />

soil.<br />

IRP STATUS<br />

RRSE RATING:<br />

High<br />

CONTAMINANTS:<br />

Metals, Ordnance Compounds<br />

MEDIA OF CONCERN:<br />

Soil, Groundwater<br />

COMPLETED IRP PHASE:<br />

PA, RFA<br />

CURRENT IRP PHASE:<br />

RFI<br />

FUTURE IRP PHASE:<br />

CMS, CMI, CM(O)<br />

CONSTRAINED COST TO COM PLETE<br />

PHASE 2001 2002 2003 2004 2005 2006 2007+<br />

RI/FS 105 80<br />

IR A<br />

RD 132<br />

RA 1260<br />

RAO<br />

LTM 6 6 6 162<br />

PROJECTED TOTAL: $1,757,000<br />

<strong>Sunflower</strong> <strong>AAP</strong> - <strong>Installation</strong> <strong>Action</strong> <strong>Plan</strong><br />

Site Descriptions - Page 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!