TEMPORARY WASTE STORAGE MAGAZINES, SF<strong>AAP</strong>-016<br />

SITE DESCRIPTION<br />

Most of the Temporary Waste Storage Magazines<br />

are located in the southwest-central portion<br />

of SF<strong>AAP</strong>. This includes the B-Area Storage<br />

Buildings B-14, B-16, B-20, B-21 and B-22.<br />

Also included in this SWMU is Building 181-2<br />

which is located in the central portion of SF<strong>AAP</strong>.<br />

Building 181-2 is an inactive 12 x 15 foot metal<br />

structure that was used to store spent<br />

degreasing solvents. The building has a concrete<br />

floor and is surrounded by an earthen dike.<br />

The solvents which were stored in 181-2 were<br />

transferred in 1984 to Building J-125, where temporary<br />

spill containment was provided. When<br />

the upgrading of J-124 was complete, the solvents<br />

were then transferred from J-125 to J-124.<br />

Over time 181-2 contained approximately 550<br />

gallons of spent degreasing solvents. During a<br />

site visit in 1990 no signs of past releases were<br />

evident. It was noted, however, that the earthen<br />

dike for spill containment for building 181-2 was<br />

“inadequate” (USAEHA, 1987) (PRC, 1990).<br />

RFI<br />

SUNFLOWER<br />

ARMY<br />

AMMUNITION<br />

PLANT<br />

INDICATES SITE LOCATIONS<br />

N<br />

RFI activities indicated elevated levels of metals<br />

and pesticides in the soil.<br />

PROPOSED PLAN<br />

In accordance with draft RFI recommendations,<br />

additional sampling will be performed to fully<br />

investigate the groundwater in the area.<br />

IRP STATUS<br />

RRSE RATING:<br />

Low<br />

CONTAMINANTS:<br />

Pesticides, Metals, Solvents<br />

MEDIA OF CONCERN:<br />

Soil and Groundwater<br />

COMPLETED IRP PHASE:<br />

PA, RFA<br />

CURRENT IRP PHASE:<br />

RFI<br />

FUTURE IRP PHASE:<br />

RC<br />

CONSTRAINED COST TO COM PLETE<br />

PHASE 2001 2002 2003 2004 2005 2006 2007+<br />

RI/FS 12<br />

IR A<br />

RD<br />

RA<br />

RAO<br />

LTM<br />

PROJECTED TOTAL: $12,000<br />

<strong>Sunflower</strong> <strong>AAP</strong> - <strong>Installation</strong> <strong>Action</strong> <strong>Plan</strong><br />

Site Descriptions - Page 16