TEMPORARY WASTE STORAGE MAGAZINES, SF<strong>AAP</strong>-016<br />
SITE DESCRIPTION<br />
Most of the Temporary Waste Storage Magazines<br />
are located in the southwest-central portion<br />
of SF<strong>AAP</strong>. This includes the B-Area Storage<br />
Buildings B-14, B-16, B-20, B-21 and B-22.<br />
Also included in this SWMU is Building 181-2<br />
which is located in the central portion of SF<strong>AAP</strong>.<br />
Building 181-2 is an inactive 12 x 15 foot metal<br />
structure that was used to store spent<br />
degreasing solvents. The building has a concrete<br />
floor and is surrounded by an earthen dike.<br />
The solvents which were stored in 181-2 were<br />
transferred in 1984 to Building J-125, where temporary<br />
spill containment was provided. When<br />
the upgrading of J-124 was complete, the solvents<br />
were then transferred from J-125 to J-124.<br />
Over time 181-2 contained approximately 550<br />
gallons of spent degreasing solvents. During a<br />
site visit in 1990 no signs of past releases were<br />
evident. It was noted, however, that the earthen<br />
dike for spill containment for building 181-2 was<br />
“inadequate” (USAEHA, 1987) (PRC, 1990).<br />
RFI<br />
SUNFLOWER<br />
ARMY<br />
AMMUNITION<br />
PLANT<br />
INDICATES SITE LOCATIONS<br />
N<br />
RFI activities indicated elevated levels of metals<br />
and pesticides in the soil.<br />
PROPOSED PLAN<br />
In accordance with draft RFI recommendations,<br />
additional sampling will be performed to fully<br />
investigate the groundwater in the area.<br />
IRP STATUS<br />
RRSE RATING:<br />
Low<br />
CONTAMINANTS:<br />
Pesticides, Metals, Solvents<br />
MEDIA OF CONCERN:<br />
Soil and Groundwater<br />
COMPLETED IRP PHASE:<br />
PA, RFA<br />
CURRENT IRP PHASE:<br />
RFI<br />
FUTURE IRP PHASE:<br />
RC<br />
CONSTRAINED COST TO COM PLETE<br />
PHASE 2001 2002 2003 2004 2005 2006 2007+<br />
RI/FS 12<br />
IR A<br />
RD<br />
RA<br />
RAO<br />
LTM<br />
PROJECTED TOTAL: $12,000<br />
<strong>Sunflower</strong> <strong>AAP</strong> - <strong>Installation</strong> <strong>Action</strong> <strong>Plan</strong><br />
Site Descriptions - Page 16