CALCIUM CARBONATE CAKE LANDFILL, SF<strong>AAP</strong>-041<br />
SITE DESCRIPTION<br />
The Calcium Carbonate Cake (CCC) Landfill is<br />
located in the west central portion of SF<strong>AAP</strong>. It<br />
measures approximately 350 by 315 feet and<br />
was operated from May 1986 to June 1988.<br />
Between May 1988 and December 1991, the<br />
CCC was provided to farmers rather than<br />
landfilled. This practice was discontinued in<br />
December 1991. Initially, containerized CCC was<br />
disposed of at this site, but later uncontainerized<br />
CCC was deposited. The source of CCC was NQ<br />
production. CCC is a byproduct of GN manufacturing,<br />
which is an intermediate product of NQ.<br />
A leachate collection system was installed in the<br />
CCC Landfill at the time of construction. The<br />
leachate in the collection system tank is reportedly<br />
monitored. During a site visit in 1990 it was<br />
noted that the landfill cap was cracked, vegetative<br />
cover was sparse, and erosional features had<br />
developed.<br />
In 1998 the landfill cap was repaired and graded<br />
to minimize erosion. Also, new ground cover<br />
was established. All work was inspected and<br />
accepted by KDHE representatives.<br />
PROPOSED PLAN<br />
Per KDHE’s requirement, one additional well will<br />
be installed. LTM and landfill maintenance will<br />
continue.<br />
SUNFLOWER<br />
ARMY<br />
AMMUNITION<br />
PLANT<br />
INDICATES SITE LOCATION<br />
N<br />
IRP STATUS<br />
RRSE RATING:<br />
Medium<br />
CONTAMINANTS:<br />
Nitrates<br />
MEDIA OF CONCERN:<br />
Groundwater<br />
COMPLETED IRP PHASE:<br />
RFA, RFI<br />
CURRENT IRP PHASE:<br />
RFI, CMI(O), LTM<br />
FUTURE IRP PHASE:<br />
CMI(O), LTM<br />
PHASE 2001 2002 2003 2004 2005 2006 2007+<br />
RI/FS 17<br />
IR A<br />
RD<br />
RA<br />
CONSTRAINED COST TO COM PLETE<br />
RAO 22 65 23 22 506<br />
LTM 3 3 3 3 3 3 69<br />
PROJECTED TOTAL: $742,000<br />
<strong>Sunflower</strong> <strong>AAP</strong> - <strong>Installation</strong> <strong>Action</strong> <strong>Plan</strong><br />
Site Descriptions - Page 41