CALCIUM CARBONATE CAKE LANDFILL, SF<strong>AAP</strong>-041<br />

SITE DESCRIPTION<br />

The Calcium Carbonate Cake (CCC) Landfill is<br />

located in the west central portion of SF<strong>AAP</strong>. It<br />

measures approximately 350 by 315 feet and<br />

was operated from May 1986 to June 1988.<br />

Between May 1988 and December 1991, the<br />

CCC was provided to farmers rather than<br />

landfilled. This practice was discontinued in<br />

December 1991. Initially, containerized CCC was<br />

disposed of at this site, but later uncontainerized<br />

CCC was deposited. The source of CCC was NQ<br />

production. CCC is a byproduct of GN manufacturing,<br />

which is an intermediate product of NQ.<br />

A leachate collection system was installed in the<br />

CCC Landfill at the time of construction. The<br />

leachate in the collection system tank is reportedly<br />

monitored. During a site visit in 1990 it was<br />

noted that the landfill cap was cracked, vegetative<br />

cover was sparse, and erosional features had<br />

developed.<br />

In 1998 the landfill cap was repaired and graded<br />

to minimize erosion. Also, new ground cover<br />

was established. All work was inspected and<br />

accepted by KDHE representatives.<br />

PROPOSED PLAN<br />

Per KDHE’s requirement, one additional well will<br />

be installed. LTM and landfill maintenance will<br />

continue.<br />

SUNFLOWER<br />

ARMY<br />

AMMUNITION<br />

PLANT<br />

INDICATES SITE LOCATION<br />

N<br />

IRP STATUS<br />

RRSE RATING:<br />

Medium<br />

CONTAMINANTS:<br />

Nitrates<br />

MEDIA OF CONCERN:<br />

Groundwater<br />

COMPLETED IRP PHASE:<br />

RFA, RFI<br />

CURRENT IRP PHASE:<br />

RFI, CMI(O), LTM<br />

FUTURE IRP PHASE:<br />

CMI(O), LTM<br />

PHASE 2001 2002 2003 2004 2005 2006 2007+<br />

RI/FS 17<br />

IR A<br />

RD<br />

RA<br />

CONSTRAINED COST TO COM PLETE<br />

RAO 22 65 23 22 506<br />

LTM 3 3 3 3 3 3 69<br />

PROJECTED TOTAL: $742,000<br />

<strong>Sunflower</strong> <strong>AAP</strong> - <strong>Installation</strong> <strong>Action</strong> <strong>Plan</strong><br />

Site Descriptions - Page 41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!