SUNFLOWER <strong>AAP</strong> COST TO COMPLETE (CONSTRAINED)<br />
DSERTS<br />
# SITE TITLE RRSE PHASE FY01 FY02 FY03 FY04 FY05 FY06 FY07+ SITE TOTAL DESCRIPTION OF WORK<br />
S<strong>AAP</strong>-023 NEW EXPLOSIVES MED RI/FS<br />
WASTE BURNING<br />
RD<br />
GROUND<br />
RA(C)<br />
RC - take out<br />
LTM 0<br />
S<strong>AAP</strong>-024 NITROGLYCERINE HIGH RI/FS 110 80 FY00 - RFI (additional sampling) (110K); FY01-CMS (80K)<br />
DITCHES RD 55 Excavation, treatment and disposal design<br />
RA(C) 825 Excavation, treatment and disposal (includes 11 sumps)<br />
LTM 10 10 30 1120 7 wells, semi-annual monitoring<br />
S<strong>AAP</strong>-025 NITROCELLULOSE HIGH RI/FS 50 70 RFI (soil and GW) (50K); CMS (70K)<br />
AREA DITCHES RD 31 Excavation, treatment and disposal design<br />
RA(C) 325 Excavation, treatment and disposal<br />
LTM 30 506 4 wells, semi-annual monitoring<br />
S<strong>AAP</strong>-026 SINGLE BASE AREA MED RI/FS 93 80 RFI (soil and groundwater) (93K); CMS (80K)<br />
WASTE WATER RD 12 Excavation, treatment and disposal design<br />
SETTLING SUMPS RA(C) 165 Excavation, treatment and disposal<br />
S<strong>AAP</strong>-027 NITROGUANIDINE AREA LOW<br />
SAC LIQUID<br />
WASTE PLANT<br />
LTM 20 10 380 6 wells, semi-annual monitoring<br />
LTM 6 6 6 12 6 48 84<br />
S<strong>AAP</strong>-028 WASTE CALCIUM CARBIDE NE RC<br />
TREATMENT<br />
LAGOONS<br />
0<br />
S<strong>AAP</strong>-029 INDUSTRIAL WASTEWATER NE RC<br />
TREATMENT<br />
LAGOONS<br />
0<br />
S<strong>AAP</strong>-030 PESTICIDE HANDLING LOW RI/FS 55 55 FY00 RFI (soil) (55K); FY01 CMS (55K)<br />
AREA<br />
RD 22 Excavation, treatment and disposal design<br />
RA(C) 275 Excavation, treatment and disposal<br />
407<br />
S<strong>AAP</strong>-031 CONTAMINATED WASTE MED RI/FS 55 55 RFI (soil and GW, also 1 well installation and sampling) (55K), CMS (55K)<br />
PROCESSOR/ RD 12 excavation, treatment and disposal design<br />
EVAPORATIVE RA(C) 110 30 excavation, treatment and disposal, confirmatory sampling<br />
LAGOONS<br />
262<br />
S<strong>AAP</strong>-032 LEAD DECONTAMINATION HIGH RI/FS RFI (Stream Study)<br />
AND RECOVERY UNIT<br />
RD<br />
RA(C)<br />
excavation, treatment and disposal (includes UST area)<br />
LTM 10 10 10 10 10 50 7 wells, semi-annual monitoring<br />
S<strong>AAP</strong>-033 PASTE AREA HALF HIGH RI/FS 80 CMS<br />
TANKS AND RD 45 excavation, treatment and disposal and capping design<br />
SETTLING POND RA(C) 550<br />
excavation, treatment and disposal, confirmatory sampling (including lagoon capping)<br />
(consider TERC contract)<br />
675<br />
S<strong>AAP</strong>-034 FIVE CORNERS HIGH RI/FS 80 CMS<br />
SETTLING POND RD 10 excavation, treatment and disposal design<br />
RA(C) 110 excavation, treatment and disposal, confirmatory sampling<br />
200<br />
Cost Estimates<br />