19.11.2013 Views

R-INSTRUKTION 087R2121 - Siemens

R-INSTRUKTION 087R2121 - Siemens

R-INSTRUKTION 087R2121 - Siemens

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Infocal 5 Communication Description Version 2.00<br />

Table of Contents<br />

1 General Information 4<br />

1.1 Guide to this document 4<br />

1.2 Parts of EN1434 implemented 4<br />

1.3 Other recommendations followed 4<br />

1.4 Timing requirements 4<br />

2 Addressing methods 5<br />

2.1 Primary addressing 5<br />

2.2 Secondary address 253 (FDH) 5<br />

2.3 Primary test address 254 (FEH) 7<br />

2.4 Primary broadcast address 255 (FFH) 7<br />

3 Set-up of Slave 7<br />

3.1 Initialisation of Slave (SND_NKE) 7<br />

3.2 Change Baud rate 7<br />

4 Normal reading 8<br />

4.1 Reading of measured values 8<br />

4.2 Reading of Calculator Status 9<br />

4.3 Reading of Fabrication Number 11<br />

4.4 Reading of Peak Values 12<br />

4.5 Reading of Actual Report values and Monthly Report 13<br />

4.6 Reading of AccountDay Record A or B 16<br />

4.7 Reading of ErrorLog 18<br />

5 Set-up parameters 20<br />

5.1 Set-up of Bus Address 20<br />

5.2 Set-up of Identification number 21<br />

5.3 Set-up of Date & Time 21<br />

5.4 Set-up of (security level 2) parameters 22<br />

6 Reading of Set-up parameters 24<br />

6.1 Reading of Bus Address 24<br />

6.2 Reading of (security level 2) parameters 25<br />

7 Application Reset 27<br />

7.1 Reset ErrorCode 27<br />

8 Timing Requirements and Recommendations 28<br />

8.1 Transmission with success 28<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!