R-INSTRUKTION 087R2121 - Siemens
R-INSTRUKTION 087R2121 - Siemens
R-INSTRUKTION 087R2121 - Siemens
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Infocal 5 Communication Description Version 2.00<br />
Table of Contents<br />
1 General Information 4<br />
1.1 Guide to this document 4<br />
1.2 Parts of EN1434 implemented 4<br />
1.3 Other recommendations followed 4<br />
1.4 Timing requirements 4<br />
2 Addressing methods 5<br />
2.1 Primary addressing 5<br />
2.2 Secondary address 253 (FDH) 5<br />
2.3 Primary test address 254 (FEH) 7<br />
2.4 Primary broadcast address 255 (FFH) 7<br />
3 Set-up of Slave 7<br />
3.1 Initialisation of Slave (SND_NKE) 7<br />
3.2 Change Baud rate 7<br />
4 Normal reading 8<br />
4.1 Reading of measured values 8<br />
4.2 Reading of Calculator Status 9<br />
4.3 Reading of Fabrication Number 11<br />
4.4 Reading of Peak Values 12<br />
4.5 Reading of Actual Report values and Monthly Report 13<br />
4.6 Reading of AccountDay Record A or B 16<br />
4.7 Reading of ErrorLog 18<br />
5 Set-up parameters 20<br />
5.1 Set-up of Bus Address 20<br />
5.2 Set-up of Identification number 21<br />
5.3 Set-up of Date & Time 21<br />
5.4 Set-up of (security level 2) parameters 22<br />
6 Reading of Set-up parameters 24<br />
6.1 Reading of Bus Address 24<br />
6.2 Reading of (security level 2) parameters 25<br />
7 Application Reset 27<br />
7.1 Reset ErrorCode 27<br />
8 Timing Requirements and Recommendations 28<br />
8.1 Transmission with success 28<br />
2