Production and Industrial Facilities - INSPIRE - Europa
Production and Industrial Facilities - INSPIRE - Europa
Production and Industrial Facilities - INSPIRE - Europa
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>INSPIRE</strong> Reference: D2.8.III.8_v2.0(.0)<br />
TWG-PF Data Specification on <strong>Production</strong> <strong>and</strong><br />
<strong>Industrial</strong> <strong>Facilities</strong><br />
2011-06-15 Page CIII<br />
12 Use Case: General Licensing Procedure<br />
for Utility <strong>and</strong> governmental services (US), <strong>Production</strong> <strong>and</strong> industrial facilities (PF), Agricultural<br />
<strong>and</strong> aquacultural facilities (AF)<br />
NOTE: This use case is in a preliminary stage of drafting – the text below includes flow charts describing<br />
licensing procedures required for different types of industrial installations <strong>and</strong>/or different stages of<br />
industrial processes.<br />
� Licensing Procedure (chart C)<br />
� Public Participation (chart D)<br />
13 Chart A<br />
B<br />
... built new ... changed<br />
Installation needs an<br />
Environment Impact<br />
Assessment, EIA?<br />
yes no<br />
First- time exceeding of specific<br />
threshold values<br />
yes no<br />
Can the change have significant<br />
adverse effects?<br />
yes no<br />
Environmental Impact<br />
Assessment or EI- Preliminary<br />
Consideration necessary!<br />
E<br />
Installation shall be....<br />
Public participation is<br />
required!<br />
Change is significant?<br />
yes no<br />
Immisson Control is subject to<br />
the permit?<br />
higher Emission lower Emission<br />
Can the change have<br />
significant adverse effects?<br />
yes no<br />
Request is made on Nonpublication?<br />
yes no<br />
D<br />
Change approval process!<br />
Notification<br />
procedures<br />
of the authorities<br />
C