November 4 - City of Hays, KS
November 4 - City of Hays, KS
November 4 - City of Hays, KS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Commission Work Session Agenda<br />
Memo<br />
From:<br />
Meeting:<br />
Subject:<br />
Person(s)<br />
Responsible:<br />
Jesse Rohr, PIE Superintendent<br />
<strong>November</strong> 4, 2010 Work Session<br />
Graystar First Addition Resolution to Establish Benefit<br />
District<br />
Toby Dougherty, <strong>City</strong> Manager<br />
Brenda Herrman, Director <strong>of</strong> Public Works<br />
Summary<br />
Graystar Corporation has petitioned the <strong>City</strong> for Street, Storm Sewer, Water, and Sanitary<br />
Sewer Improvements to an area containing 14 lots in the Graystar First Addition. The<br />
engineers estimate for total construction costs are $952,965 including engineering costs. This<br />
project is consistent with past residential developments within the <strong>City</strong> <strong>of</strong> <strong>Hays</strong>. Staff<br />
recommends adopting the attached resolution authorizing the improvements in the estimated<br />
and amount <strong>of</strong> $952,965.<br />
Background<br />
The final plat for Graystar First Addition was approved at the April 22, 2010 <strong>City</strong><br />
Commission meeting. The property is zoned R-1, single-family residential district. The<br />
developer wishes to establish a benefit district to fund the improvements for the residential<br />
development.<br />
Discussion<br />
Graystar Corporation has petitioned the <strong>City</strong> for Street, Storm Sewer, Water, and Sanitary<br />
Sewer Improvements to an area containing 14 lots in the Graystar First Addition. This will be<br />
the first phase <strong>of</strong> this development. The engineers estimate for total construction costs for the<br />
improvements to and along Graystar Circle and Post Rd is $952,965, including engineering<br />
costs. The Developer will pay 30% (estimated at $285,890) <strong>of</strong> the costs for the construction<br />
<strong>of</strong> the improvements with the remaining 70% (estimated at $667,075) to be assessed to Lots 1-<br />
14 <strong>of</strong> the Graystar First Addition. There are no costs to the <strong>City</strong> for any oversizing <strong>of</strong><br />
infrastructure. The plan is to construct the streets to 31 foot in width as allowed by the <strong>City</strong> <strong>of</strong><br />
<strong>Hays</strong> Development Policy Infrastructure Guidelines for New Development. This project is<br />
consistent with past residential developments within the <strong>City</strong> <strong>of</strong> <strong>Hays</strong>.<br />
57