ENGINEERING SERVICES AGREEMENT<br />
THIS AGREEMENT, entered into on the __________ day <strong>of</strong> ________________, 2010, by<br />
the <strong>City</strong> <strong>of</strong> <strong>Hays</strong>, Kansas, party <strong>of</strong> the first part, hereinafter referred to as the "<strong>City</strong>", and Graystar<br />
Corporation, party <strong>of</strong> the second part, hereinafter referred to as the “Developer” and the firm <strong>of</strong><br />
Ruder Engineering & Surveying, LLC, party <strong>of</strong> the third part, hereinafter referred to as the<br />
“Consultant”.<br />
WITNESSETH:<br />
That the <strong>City</strong> and the Developer plan to complete improvements to and within the Graystar<br />
First Addition. The improvements include the sanitary sewer lines, water lines and street<br />
construction needed to serve the lots in said Addition.<br />
These improvements will be hereinafter referred to as the "IMPROVEMENT".<br />
That the <strong>City</strong> and the Developer require pr<strong>of</strong>essional engineering services to assist them in<br />
implementing the IMPROVEMENT.<br />
That the <strong>City</strong> and the Developer have selected Ruder Engineering & Surveying, LLC to<br />
perform these services;<br />
NOW, THEREFORE, in consideration <strong>of</strong> these premises and the mutual covenants herein<br />
contained, the Parties hereto agree as follows:<br />
ARTICLE I<br />
SCOPE OF SERVICES<br />
Ruder Engineering & Surveying, LLC shall be responsible for engineering services required<br />
by the various portions <strong>of</strong> the "IMPROVEMENT". The services required on the<br />
"IMPROVEMENT" are described as follows:<br />
Engineering Design Phase:<br />
1. Perform field surveys to collect pertinent topographic and engineering data necessary to<br />
complete the design <strong>of</strong> the water lines, sewer lines and streets as listed above.<br />
2. Prepare bid and construction documents in sufficient detail, using <strong>City</strong>’s standards, where<br />
applicable, to allow competitive bids to be received. All portions <strong>of</strong> the project shall be included<br />
in the same set <strong>of</strong> the bid and construction documents.<br />
3. Review documents and project budget and perform a field check <strong>of</strong> the project with <strong>City</strong> Staff<br />
and the Developer.<br />
4. Prepare "Engineers Estimate <strong>of</strong> Probable Cost" to be used in evaluating bids.<br />
65