08.01.2014 Views

RULES AND REGULATIONS FOR HOSPICE IN ARKANSAS

RULES AND REGULATIONS FOR HOSPICE IN ARKANSAS

RULES AND REGULATIONS FOR HOSPICE IN ARKANSAS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>RULES</strong> <strong>AND</strong> <strong>REGULATIONS</strong> <strong>FOR</strong> <strong>HOSPICE</strong> <strong>IN</strong> <strong>ARKANSAS</strong><br />

but essential to the functioning of a complete facility shall comply<br />

(at a minimum) with the appropriate sections of NFPA 101 covering<br />

existing occupancies. Existing portions of the facility that receive<br />

less than substantial amounts of new work, shall also comply (at a<br />

minimum) with the appropriate sections of NFPA 101 covering<br />

existing occupancies.<br />

c. Facilities or portions of facilities shall be permitted to be occupied<br />

during construction, renovation, and repair only where required<br />

means of egress and required fire protection features are in place<br />

and continuously maintained for the portion occupied or where<br />

alternate life safety measures acceptable to the Division and other<br />

authorities having jurisdiction are in place.<br />

2. New, Addition, Simple Renovation, and Complex Renovation shall be<br />

designed, constructed, and renovated in accordance with the applicable<br />

Sections of these regulations and all Appendices and publications<br />

referenced by these Sections.<br />

3. Repair projects shall be designed and constructed in a manner that does<br />

not diminish the safety level that existed prior to the start of the work.<br />

G. Project Review and Approval Process.<br />

1. Coordination: Health Facilities Services will coordinate the review and<br />

approval process for all offices of the Department.<br />

2. New, Addition, Simple or Complex Renovation Projects shall be reviewed<br />

and approved by the Division as indicated below:<br />

a. Drawing Review and Approval Process:<br />

1) Submission of Plan Review Fee: A plan review fee in the<br />

amount of one percent of the total cost of construction or<br />

$500.00, whichever is less, shall be paid for the review of<br />

plans and specifications. The plan review fee check is to be<br />

made payable to the Arkansas Department of Health and<br />

Human Services. A detailed estimate shall accompany the<br />

plans unless the maximum fee of $500.00 is paid.<br />

2) Submission of Functional Program and Cost Estimate.<br />

3) Submission of Site Location.<br />

4) Submission of Preliminary Plans.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!