solaris 24PC 30PC - Heatline
solaris 24PC 30PC - Heatline
solaris 24PC 30PC - Heatline
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>solaris</strong> <strong>24PC</strong>, <strong>30PC</strong><br />
15. Onboard Adjustments<br />
Potentiometer<br />
adjustment cover<br />
15.1 The boiler incorporates 4 potentiometers<br />
and a bank of dip switches to allow adjustment<br />
to its pre-set parameters. These are situated on<br />
the rear of the control panel. (figure 19)<br />
POTENTIOMETERS<br />
DIP SWITCHES<br />
23<br />
P7<br />
P5<br />
P2<br />
P4<br />
Figure 19<br />
The potentiometers can easily be accessed by<br />
removing the cover on the rear of control<br />
panel (Figure 20). However, to reach the dip<br />
switches, the control panel must be opened.<br />
P7 – Ignition fan ramp<br />
(default setting 4 0’clock)<br />
P5 – Anti cycle timer adjustment<br />
(default setting 6 0’clock)<br />
P2 - Boiler range adjuster<br />
(default setting 4 0’clock)<br />
P4 – Maximum Fan sped adjustment<br />
(default setting 4 0’clock)<br />
15.2 Setting the maximum c/heating flow<br />
temperature: The boiler is dispatched with a<br />
maximum flow temperature factory set to 85°C.<br />
Where a lower maximum temperature is required<br />
such as in the case of under-floor heating,<br />
the factory setting can be altered between a<br />
maximum of 50°C and a minimum of 30ºC,<br />
by setting dip switch '6' into ON position.<br />
15.3 Setting the 45 second delay: The boiler is<br />
factory set to exclude the delay of 45 seconds<br />
before re-ignition between the closing of a hot<br />
water faucet and CH start-up. This delay can be<br />
set to 45 seconds by setting dip switch ‘3’<br />
(figure 19) into the OFF position.<br />
15.4 255 seconds delay setting: The boiler is<br />
capable of up to 255 seconds ignition delay (anti<br />
cycling time) before re-ignition following burner<br />
shut down on the primary hydraulic water<br />
reaching its set temperature. This delay can be<br />
increased up to a maximum of 255 seconds by<br />
turning potentiometer P5 (Figure 19) clockwise.<br />
15.5 Pump working mode setting: The boiler has<br />
a factory set to operate the pump for pre-purge and<br />
post-purge times (45 sec.). This delay can be<br />
excluded by fitting dipswitch ‘2’ (figure 19) into<br />
ON position. However, this may then cause the<br />
boiler over-heat thermostat to trip out.<br />
15.6 The maximum and minimum heat output for<br />
heating is adjusted via potentiometer P2 (figure<br />
19) which changes the fan speed and thus the gas<br />
rate. It is not necessary to make further<br />
adjustments.<br />
Page 23