solaris 24PC 30PC - Heatline
solaris 24PC 30PC - Heatline
solaris 24PC 30PC - Heatline
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>solaris</strong> <strong>24PC</strong>, <strong>30PC</strong><br />
35<br />
NOTE:<br />
When installing, commissioning or servicing<br />
a gas appliance that incorporates a pre-mix<br />
burner and zero-set governor, because it is not<br />
possible to measure an operating pressure the<br />
engineer should first check that the gas supply<br />
is metered and ascertain whether it is possible<br />
to measure the gas rate. If the gas input rate<br />
can be measured then the requirements of<br />
GSIUR 26(9) can be met, including any<br />
specific requirements in manufacturers’<br />
instructions.If gas input rate cannot be<br />
measured then, to satisfy the intent of GSIUR<br />
26(9), the engineer shall measure the<br />
combustion quality of the appliance in<br />
accordance with BS 7967 or the technical<br />
data of this manual.<br />
If the engineer does not have the required<br />
equipment and no alternative test is specified<br />
by the manufacturer then the appliance shall<br />
be turned off and disconnected as an uncommissioned<br />
appliance until such time that<br />
equipment is available to undertake such<br />
tests.<br />
Page 35