2.2.1.3 The main purpose for pedestrian and other users’ journeys on Friday and<br />
Saturday were to reach home or work. This trend is slightly altered on<br />
Sunday, when NMU facilities were predominantly used to reach home, or<br />
for recreational purposes. Footpaths and cycleways were also used to<br />
enable pedestrians and others to reach retail facilities, particularly on<br />
Saturday.<br />
2.2.1.4 In summary, the results of the survey indicate that there was no greater use<br />
of the pedestrian facilities, within the Study Area, on any one day. During<br />
the survey, 378 cyclists and 1<strong>10</strong>4 pedestrians, of whom 9 were vulnerable<br />
users, passed through the Study Area. No equestrians were observed<br />
during the study. The busiest entry points were those around Stivichall<br />
Junction and Tollbar End roundabout. A relatively high proportion of NMU<br />
also used the footpaths/cycleways along the A45 Stonebridge Highway,<br />
particularly between Stonehouse Lane, Selsey Close and the entrance to<br />
the playing fields.<br />
2.2.1.5 However, compared to the numbers of vehicular traffic using Tollbar End<br />
roundabout, Stivichall Junction and the A45 Stonebridge Highway, the<br />
number of NMU recorded in the vicinity of the Scheme was low, and<br />
therefore of slight significance.<br />
2.2.1.6 Further details regarding the patterns of NMU movements are given below.<br />
Pedestrians<br />
2.2.1.7 In general, the number of pedestrians using the routes within the Study<br />
Area was approximately equal on each day of the survey.<br />
2.2.1.8 Interpretation of the NMU results have shown that:<br />
<br />
<br />
<br />
The busiest entry points during the survey period were those around<br />
Stivichall Junction and Tollbar End roundabout (Entry Points D, E and<br />
F at Stivichall Junction; entry points 1, 6, <strong>12</strong>, 15 and 22 at Tollbar End<br />
roundabout). Along the A45 Stonebridge Highway, entry points 21<br />
and 31 were busiest (See Table <strong>12</strong>.8, Appendix <strong>12</strong>.1). The <strong>12</strong>-hour<br />
average NMU volumes for the busiest entry points are detailed in<br />
Table <strong>12</strong>.6 below;<br />
In general, the routes around Stivichall Junction were used for short<br />
journeys to enable NMU to negotiate crossing the junction. Journeys<br />
made using an entry point at Stivichall Junction also ended via exit<br />
points at Stivichall Junction; and,<br />
Similarly, NMU using entry points at Tollbar End roundabout also<br />
exited the Study Area via exit points at Tollbar End roundabout.<br />