4.2.1.4 The track through the centre of the existing roundabout and the pedestrian /<br />
cyclist crossing of the A46 Coventry Eastern Bypass westbound on slip<br />
would be removed. A 3.0m wide footpath / cycleway would be provided on<br />
the inside of the roundabout of the Tollbar End Junction. Four signalised<br />
crossings would be provided: near Siskin Drive, at the A45 London Road,<br />
at the A45 Stonebridge Highway off-slip, and at the B41<strong>10</strong> London Road.<br />
The footpath / cycleway on the roundabout and the signalised crossings<br />
would provide for all movements with minimal increases in journey times.<br />
4.2.1.4 The changes in the facilities at the roundabout would provide improved<br />
crossings at the Rowley Road and Siskin Drive Crossing than the current<br />
facilities.<br />
4.2.1.5 However the removal of the crossing at the A46 Coventry Eastern Bypass<br />
on slip and the track through the centre of the roundabout would slightly<br />
increase journey times. The approximate increase in journey time has<br />
been assessed to be less than 1 minute. This has assessed to be slight<br />
adverse.<br />
4.2.1.4 A minimum of two additional footpath accesses would be provided from the<br />
combined footpath/cycleway on the south side of the A45 Stonebridge<br />
Highway to the Stonebridge Trading Estate.<br />
4.2.1.5 The closure of Footpath No. 443 would impact upon users on a permanent<br />
basis. However, no significant impact is expected, as the level of usage on<br />
both routes is currently very low, and an increase in journey time of 1<br />
minute and <strong>12</strong> seconds is considered to be of low significance (see Table<br />
<strong>12</strong>.7).<br />
Table <strong>12</strong>.7 Predicted Changes in Journey Length and Times in 2011 – Removal of Footpath 443<br />
Distance<br />
(km)<br />
Approx.<br />
increase in<br />
journey length<br />
(km)<br />
Approx.<br />
average<br />
time* (mins)<br />
Approx.<br />
increase in<br />
journey time<br />
(mins)<br />
Do<br />
Minimum<br />
Do<br />
Something<br />
0.248 1.2<br />
0.486<br />
0.238<br />
* 5km/hr speed used for people on foot<br />
2.4<br />
1.2<br />
4.2.1.6 The changes to the A45 Stonebridge Highway would prevent pedestrians<br />
from crossing the A45 between Stonehouse Lane and Footpath 443, and<br />
lead them to use the crossing points provided at Tollbar End roundabout.<br />
The current crossing of the A45 Stonebridge Highway is not a designated<br />
crossing point, and as such the change in journey times has not been<br />
calculated. The prevention of this ‘short-cut’ across the A45 Stonebridge<br />
Highway would, however, confer a significant safety benefit for pedestrian<br />
usage.<br />
Environmental Statement <strong>Volume</strong> 2<br />
A45/A46 Tollbar End Improvement<br />
Page 24<br />
<strong>Part</strong> <strong>12</strong>: Pedestrians et al<br />
March 2009