1 Introduction<br />
1.1 General<br />
1.1.0.1 This report assesses the potential impacts of the proposed A45 / A46<br />
Tollbar End Improvement Scheme (hereinafter referred to as ‘the Scheme’)<br />
on pedestrians, cyclists, equestrians and communities. For ease of<br />
reference, the term ‘pedestrians and others’ is used in this report to<br />
describe this group.<br />
1.2 The Proposed Scheme<br />
1.2.0.1 The Tollbar End roundabout is a strategic junction on the trunk road<br />
network, near Coventry. The junction facilitates the movement of vehicles<br />
between London and the Midlands and services movement between the<br />
M40, M6, M1, M42, M45 and M69 motorways. The junction also facilitates<br />
the movement of local traffic, in particular to Coventry Airport and the<br />
nearby businesses and industries. A location plan showing the position of<br />
the Scheme on the network is shown in Figure 1.1.<br />
1.2.0.2 The Scheme would provide a dual 3-lane bypass to follow the existing A45<br />
line between Stivichall Junction and Tollbar End roundabout. The Tollbar<br />
End roundabout would be improved to a grade-separated junction with an<br />
underpass between the A45 Stonebridge Highway and the A46 Coventry<br />
Eastern Bypass. The Scheme also includes improvements to the<br />
northbound off-slip on the A46 Kenilworth Bypass. A plan of the Scheme is<br />
shown in Figure 1.2.<br />
1.2.0.3 The A45 / A46 Tollbar End Improvement Scheme comprises the following<br />
elements:<br />
<br />
<br />
<br />
<br />
<br />
<br />
Grade-separation of the Tollbar End roundabout, by construction of a<br />
new dual two-lane underpass connecting the A46 Coventry Eastern<br />
Bypass to the eastern end of the A45 Stonebridge Highway;<br />
Construction of two single span structures to accommodate the<br />
grade-separation;<br />
Enlargement of Tollbar End roundabout, with improved traffic signal<br />
controls;<br />
Construction of a new signalised junction at the intersection of Siskin<br />
Drive and Rowley Road;<br />
Asymmetrical widening to the south of the existing A45 Stonebridge<br />
Highway between the Tollbar End roundabout and Stivichall Junction<br />
(approximately 1.9 km west of Tollbar End), from dual two-lane<br />
carriageway to dual three-lane carriageway;<br />
Addition of sign gantries; 3 no. on the A46 Kenilworth Bypass<br />
northbound approach to Stivichall Junction, and 4 no. on the A45<br />
Stonebridge Highway between Stivichall Junction and Tollbar End<br />
roundabout;<br />
Environmental Statement <strong>Volume</strong> 2<br />
A45/A46 Tollbar End Improvement<br />
Page 1<br />
<strong>Part</strong> <strong>12</strong>: Pedestrians et al<br />
March 2009