21.01.2014 Views

OES Annual Report 2012 - Ocean Energy Systems

OES Annual Report 2012 - Ocean Energy Systems

OES Annual Report 2012 - Ocean Energy Systems

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

50<br />

Fundy Tidal Inc., a community-based project developer, was awarded COMFIT approvals for 5 of their<br />

projects: Digby Gut (1.5 MW); Petit Passage (500 kW) and Grand Passage (500 kW) which are near the<br />

mouth of the Bay of Fundy, and near Cape Breton; Grand Narrows / Barra Strait (100 kW) and; Great<br />

Bras D’Or Channel (500 kW). Currently, Fundy Tidal Inc. is undertaking resource assessment analyses,<br />

site characterization and screening-level environmental assessment work. In-stream tidal current energy<br />

converters for these projects will be chosen through a request for proposal (RFP) process.<br />

Clean Current is preparing for early spring deployment of their new river-current turbine for initial testing<br />

and demonstration in Manitoba.<br />

Idénergie is a new company that is developing very-small scale river-current energy converters. They have<br />

conducted initial trials with their machine in Quebec.<br />

Verdant Power is moving forward with the CORE project in the St. Lawrence River, near Cornwall in Ontario.<br />

Emera is understood to be advancing their tidal development plans in Nova Scotia, with the aim of<br />

contributing to the first Marine Renewable <strong>Energy</strong> Technology Roadmap target in 2016.<br />

ANNUAL<br />

REPORT <strong>2012</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!