13.02.2014 Views

GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company

GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company

GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10. Product Acceptance<br />

<strong>GLOBAL</strong> <strong>SUPPLIER</strong> <strong>QUALITY</strong> <strong>MANUAL</strong> 2010<br />

10.1. Minimum Requirements and Penalties<br />

Product supplied to SLOAN will be subject to inspection and verification at receipt to assure<br />

compliance with technical and administrative requirements.<br />

SLOAN reserves the right to perform source inspection or to request third-party inspection at the<br />

supplier’s facility.<br />

Suppliers who send material not meeting expectations will be responsible for the costs involved in<br />

sorting, repairing, reworking and replacing this product or material. The supplier will be responsible<br />

for providing these services with their own or third party resources. All cost associated for any of<br />

these activities performed or coordinated by SLOAN personnel will be passed down to the supplier<br />

accordingly at a rate of $50.00 per person per hour.<br />

Where material or product is found to be discrepant at receipt or upon subsequent use, even if no<br />

rework, repair or replacement is necessary, the supplier is expected to develop and implement<br />

corrective actions to address the issue. Time lines for completion of these actions will be based on<br />

the extent and impact of the discrepancy as assigned by the Supplier Quality Engineer.<br />

Suppliers are responsible for maintaining documentation showing inspection and/or testing of any<br />

in-process, final or lot sample testing and inspection for material and product provided. These<br />

documents must be available for review upon request. This documentation must be maintained for<br />

a minimum of two years from the shipment of material.<br />

12 April 2010 GQA <strong>SUPPLIER</strong> <strong>MANUAL</strong> 1-2010 (Rev 2).docx

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!