GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company
GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company
GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>GLOBAL</strong> <strong>SUPPLIER</strong> <strong>QUALITY</strong> <strong>MANUAL</strong> 2010<br />
11. Packaging, Labeling and Handling<br />
All packaging, labeling and handling requirements will be specified and included as part of the<br />
contract and/or purchase order.<br />
1. Packing list minimum requirements include:<br />
a. Material Number<br />
b. Engineering Revision Level<br />
c. Part or Product Description<br />
d. Quantity (ordered and shipped, if different)<br />
e. Number of cartons, containers, etc., including quantity in each<br />
f. PO Number<br />
g. Any other as previously agreed to<br />
2. Invoice minimum requirements include:<br />
a. Invoice Date and Number<br />
b. Ship To Information<br />
c. PO Number<br />
d. Material Number<br />
e. Engineering Revision Level<br />
f. Part or Product Description<br />
g. Invoice Quantity and Amount<br />
13 April 2010 GQA <strong>SUPPLIER</strong> <strong>MANUAL</strong> 1-2010 (Rev 2).docx