4. Part Approval<br />
<strong>GLOBAL</strong> <strong>SUPPLIER</strong> <strong>QUALITY</strong> <strong>MANUAL</strong> 2010<br />
4.1. Prototype and Initial Sample Submission<br />
Suppliers are required to comply with the Automotive Industry Action Group (AIAG) Production Part<br />
Approval Process (PPAP) requirements (www.aiag.org). A “Level 3” PPAP is required for all<br />
submissions unless otherwise specified.<br />
Related PPAP requirements, level information and applicable forms are contained in Appendix E of<br />
this manual.<br />
4.2. Tooling and Gauge Requirements<br />
Suppliers will be responsible for the purchase, maintenance, and calibration of all gages and<br />
equipment necessary to maintain process and product control. Calibration systems must comply<br />
with recognized ANSI/ASQ standards. Current SLOAN supplied tooling and gauges will be<br />
maintained utilizing the same process.<br />
6 April 2010 GQA <strong>SUPPLIER</strong> <strong>MANUAL</strong> 1-2010 (Rev 2).docx