13.02.2014 Views

GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company

GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company

GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. Part Approval<br />

<strong>GLOBAL</strong> <strong>SUPPLIER</strong> <strong>QUALITY</strong> <strong>MANUAL</strong> 2010<br />

4.1. Prototype and Initial Sample Submission<br />

Suppliers are required to comply with the Automotive Industry Action Group (AIAG) Production Part<br />

Approval Process (PPAP) requirements (www.aiag.org). A “Level 3” PPAP is required for all<br />

submissions unless otherwise specified.<br />

Related PPAP requirements, level information and applicable forms are contained in Appendix E of<br />

this manual.<br />

4.2. Tooling and Gauge Requirements<br />

Suppliers will be responsible for the purchase, maintenance, and calibration of all gages and<br />

equipment necessary to maintain process and product control. Calibration systems must comply<br />

with recognized ANSI/ASQ standards. Current SLOAN supplied tooling and gauges will be<br />

maintained utilizing the same process.<br />

6 April 2010 GQA <strong>SUPPLIER</strong> <strong>MANUAL</strong> 1-2010 (Rev 2).docx

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!