GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company
GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company
GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>GLOBAL</strong> <strong>SUPPLIER</strong> <strong>QUALITY</strong> <strong>MANUAL</strong> 2010<br />
3. Supplier Approval and Certification<br />
3.1. Introduction<br />
Only approved suppliers will be eligible to supply production material to SLOAN.<br />
Qualification and approval will depend on a successful review of a supplier’s total quality<br />
management (TQM) capabilities in alignment with the ISO9001 standard. Copies of the “Supplier<br />
Quality Survey”, form FQA7.4.5 used for this review can be found in Appendix C of this manual.<br />
In addition to the elements listed in the “Supplier Quality Survey” forms, the supplier will be<br />
responsible for demonstrating:<br />
• Supplier’s current delivery performance based on 100% on-time expectation<br />
• Quality performance with defect rates less than 5,000 ppm<br />
• Available Manufacturing Capacity for the volume of product projected.<br />
• Ability to provide inspection, component testing and design analysis (where appropriate) of<br />
product as required.<br />
• Process control and capability at a minimum Cpk/Ppk of 1.33 or better for variable data.<br />
• Technical and Managerial capacity and continuity.<br />
• Technical support and availability<br />
• Financial stability<br />
• Information Technology infrastructure compatibility<br />
3.2. Supplier Evaluation<br />
Upon evaluation, which may include site visits and auditing of the facilities, product and production<br />
processes, a review will be facilitated by a cross functional team consisting of members from the<br />
Quality, Sourcing and Engineering Departments and the results forwarded to the supplier. This<br />
review will include both financial and quality aspects of the business.<br />
The results of this review will indicate each supplier to either a Non-Certified or Certified supplier<br />
status (Appendix D).<br />
Certified suppliers meet and exceed minimum requirements and have shown a consistent history of<br />
satisfying the supplier performance metrics. Certified suppliers will be assigned to “Dock to Stock”<br />
status from the receiving inspection process at SLOAN facilities.<br />
Non-Certified suppliers will be assigned a SLOAN contact person who will be the primary contact for<br />
all activity outside the direct purchasing process. This contact will work with the supplier to develop<br />
a monitoring and improvement program with the intent of bringing the supplier’s level of<br />
performance on the elements listed in the Supplier Performance Metrics up to the 90% level.<br />
Each non-certified supplier will have a maximum of 1 year or a mutually agreed upon schedule to<br />
reach this level of performance. If after this time, the supplier has not been able to reach the 90%<br />
4 April 2010 GQA <strong>SUPPLIER</strong> <strong>MANUAL</strong> 1-2010 (Rev 2).docx