13.02.2014 Views

GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company

GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company

GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>GLOBAL</strong> <strong>SUPPLIER</strong> <strong>QUALITY</strong> <strong>MANUAL</strong> 2010<br />

3. Supplier Approval and Certification<br />

3.1. Introduction<br />

Only approved suppliers will be eligible to supply production material to SLOAN.<br />

Qualification and approval will depend on a successful review of a supplier’s total quality<br />

management (TQM) capabilities in alignment with the ISO9001 standard. Copies of the “Supplier<br />

Quality Survey”, form FQA7.4.5 used for this review can be found in Appendix C of this manual.<br />

In addition to the elements listed in the “Supplier Quality Survey” forms, the supplier will be<br />

responsible for demonstrating:<br />

• Supplier’s current delivery performance based on 100% on-time expectation<br />

• Quality performance with defect rates less than 5,000 ppm<br />

• Available Manufacturing Capacity for the volume of product projected.<br />

• Ability to provide inspection, component testing and design analysis (where appropriate) of<br />

product as required.<br />

• Process control and capability at a minimum Cpk/Ppk of 1.33 or better for variable data.<br />

• Technical and Managerial capacity and continuity.<br />

• Technical support and availability<br />

• Financial stability<br />

• Information Technology infrastructure compatibility<br />

3.2. Supplier Evaluation<br />

Upon evaluation, which may include site visits and auditing of the facilities, product and production<br />

processes, a review will be facilitated by a cross functional team consisting of members from the<br />

Quality, Sourcing and Engineering Departments and the results forwarded to the supplier. This<br />

review will include both financial and quality aspects of the business.<br />

The results of this review will indicate each supplier to either a Non-Certified or Certified supplier<br />

status (Appendix D).<br />

Certified suppliers meet and exceed minimum requirements and have shown a consistent history of<br />

satisfying the supplier performance metrics. Certified suppliers will be assigned to “Dock to Stock”<br />

status from the receiving inspection process at SLOAN facilities.<br />

Non-Certified suppliers will be assigned a SLOAN contact person who will be the primary contact for<br />

all activity outside the direct purchasing process. This contact will work with the supplier to develop<br />

a monitoring and improvement program with the intent of bringing the supplier’s level of<br />

performance on the elements listed in the Supplier Performance Metrics up to the 90% level.<br />

Each non-certified supplier will have a maximum of 1 year or a mutually agreed upon schedule to<br />

reach this level of performance. If after this time, the supplier has not been able to reach the 90%<br />

4 April 2010 GQA <strong>SUPPLIER</strong> <strong>MANUAL</strong> 1-2010 (Rev 2).docx

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!