GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company
GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company
GLOBAL SUPPLIER QUALITY MANUAL - Sloan Valve Company
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Deviation Approval Request<br />
Date:<br />
Quality Champion:<br />
Deviation Number Part Number Revision Number All Parts Effected<br />
Engineering Drawing # Department Code Defect Code Deviation Quantity<br />
Use-As-Is Receiving Inspection Supplier Parts Life of Tool Alternate Bill<br />
Deviation Nonconformance Not Available Deviation of Materials<br />
Fill in the following blanks, as applicable.<br />
RMR Number Supplier Name Supplier Location RIR Number Tool ID Number<br />
Complete the Inspection Summary, including the Drawing Number and the dimensions to deviate.<br />
Print Dimensions and Tolerances Sample 1 Measurements Sample 2 Measurements Sample 3 Measurements<br />
Dimension 1<br />
Dimension 2<br />
Dimension 3<br />
Inspected By:<br />
Inspection Date:<br />
Description of Nonconformance:<br />
Reason or Cause of Deviation:<br />
Corrective Action:<br />
Date Corrective Action Implemented:<br />
Deviation Action Plan:<br />
Corrective Action Audit Date:<br />
Deviation Closeout Plan:<br />
Deviation Expiration/Closeout Date:<br />
Order Quantity:<br />
Deviation Requested By:<br />
Quality Assurance Approval Date Comments :<br />
Material Manager Approval Date Comments :<br />
Design Engineering Approval Date Comments :<br />
Interchangeability Affected? Yes No<br />
Fit / Form / Function Affected? Yes No<br />
Sales / Marketing Approval (As Required) Date Comments :<br />
Customer Concession Required? Yes No<br />
Technical Support Services Approval (As Required) Date Comments :<br />
Manufacturing Engineering Approval or Purchasing (As<br />
Required)<br />
Date<br />
Comments :