20.02.2014 Views

Heatrae Sadia Electromax Installation Guide - Advanced Water

Heatrae Sadia Electromax Installation Guide - Advanced Water

Heatrae Sadia Electromax Installation Guide - Advanced Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Contents<br />

SECTION<br />

PAGE<br />

SECTION<br />

PAGE<br />

1.0 Introduction<br />

1.1 Important Notes 3<br />

1.2 Basic Operation of the<br />

<strong>Electromax</strong> 3<br />

1.3 Storage, Unpacking and<br />

Handling 4<br />

1.4 Contents Check List 4<br />

2.0 Technical Data 5<br />

3.0 General Requirements<br />

3.1 Location of the <strong>Electromax</strong> 9<br />

3.2 <strong>Water</strong> Supply 9<br />

3.3 Pipework, Fittings and Outlet/<br />

Terminal Fittings 10<br />

3.4 Treatment of the Primary<br />

(Central Heating) Circulating<br />

System 10<br />

3.5 Sealed Primary Systems 11<br />

4.0 <strong>Installation</strong> - General<br />

4.1 Positioning the <strong>Electromax</strong> 12<br />

4.2 Removal of Panels 12<br />

4.3 Cable Entry Positions 13<br />

4.4 Programmable Room<br />

Thermostat 13<br />

5.0 <strong>Installation</strong> - Plumbing<br />

5.1 Pipe Fittings 14<br />

5.2 Cold <strong>Water</strong> Combination<br />

Valve 14<br />

5.3 Secondary Expansion Vessel 14<br />

5.4 Balanced Hot <strong>Water</strong> Supplies 15<br />

5.5 Outlet Pipework 15<br />

5.6 Secondary Circulation 15<br />

5.7 Discharge Pipework 15<br />

5.8 Primary (Central Heating)<br />

Pipework 18<br />

6.0 <strong>Installation</strong> - Electrical<br />

6.1 Important Notes 19<br />

6.2 Off Peak and 24 Hour<br />

Electrical Supply 19<br />

6.3 Boiler Connection (45 Amp) 21<br />

6.4 Programmable Room<br />

Thermostat 21<br />

7.0 Commissioning<br />

7.1 Filling the <strong>Electromax</strong><br />

Cylinder 22<br />

7.2 Filling the Sealed System<br />

Primary Circuit 23<br />

7.3 Check the Operation of the<br />

Safety Valves 23<br />

7.4 Set the Programmable Room<br />

Thermostat 24<br />

7.5 Preliminary Electrical Checks 24<br />

7.6 Check Operation of the<br />

Electric Boiler 24<br />

7.7 Setting the Automatic By-pass<br />

Valve 25<br />

7.8 Check Operation of the<br />

Immersion Heaters 26<br />

7.9 Demonstration to User 26<br />

8.0 Maintenance<br />

8.1 Maintenance Requirements 27<br />

8.2 Check Cylinder <strong>Water</strong> Supply 27<br />

8.3 Descaling Immersion Heaters 27<br />

8.4 Operation of Cylinder Safety<br />

Valves 28<br />

8.5 Operation of Primary System<br />

Safety Valve 28<br />

8.6 Primary System Expansion<br />

Vessel Charge Pressure 28<br />

8.7 Electrical Checks 29<br />

9.0 Fault Finding and Servicing<br />

9.1 Fault Finding 30<br />

9.2 Replacement Parts 35<br />

9.3 Servicing 37<br />

10.0 Guarantee 43<br />

11.0 Spares Stockists 44<br />

2 <strong>Installation</strong> & Servicing Instructions

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!