Heatrae Sadia Electromax Installation Guide - Advanced Water
Heatrae Sadia Electromax Installation Guide - Advanced Water
Heatrae Sadia Electromax Installation Guide - Advanced Water
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Contents<br />
SECTION<br />
PAGE<br />
SECTION<br />
PAGE<br />
1.0 Introduction<br />
1.1 Important Notes 3<br />
1.2 Basic Operation of the<br />
<strong>Electromax</strong> 3<br />
1.3 Storage, Unpacking and<br />
Handling 4<br />
1.4 Contents Check List 4<br />
2.0 Technical Data 5<br />
3.0 General Requirements<br />
3.1 Location of the <strong>Electromax</strong> 9<br />
3.2 <strong>Water</strong> Supply 9<br />
3.3 Pipework, Fittings and Outlet/<br />
Terminal Fittings 10<br />
3.4 Treatment of the Primary<br />
(Central Heating) Circulating<br />
System 10<br />
3.5 Sealed Primary Systems 11<br />
4.0 <strong>Installation</strong> - General<br />
4.1 Positioning the <strong>Electromax</strong> 12<br />
4.2 Removal of Panels 12<br />
4.3 Cable Entry Positions 13<br />
4.4 Programmable Room<br />
Thermostat 13<br />
5.0 <strong>Installation</strong> - Plumbing<br />
5.1 Pipe Fittings 14<br />
5.2 Cold <strong>Water</strong> Combination<br />
Valve 14<br />
5.3 Secondary Expansion Vessel 14<br />
5.4 Balanced Hot <strong>Water</strong> Supplies 15<br />
5.5 Outlet Pipework 15<br />
5.6 Secondary Circulation 15<br />
5.7 Discharge Pipework 15<br />
5.8 Primary (Central Heating)<br />
Pipework 18<br />
6.0 <strong>Installation</strong> - Electrical<br />
6.1 Important Notes 19<br />
6.2 Off Peak and 24 Hour<br />
Electrical Supply 19<br />
6.3 Boiler Connection (45 Amp) 21<br />
6.4 Programmable Room<br />
Thermostat 21<br />
7.0 Commissioning<br />
7.1 Filling the <strong>Electromax</strong><br />
Cylinder 22<br />
7.2 Filling the Sealed System<br />
Primary Circuit 23<br />
7.3 Check the Operation of the<br />
Safety Valves 23<br />
7.4 Set the Programmable Room<br />
Thermostat 24<br />
7.5 Preliminary Electrical Checks 24<br />
7.6 Check Operation of the<br />
Electric Boiler 24<br />
7.7 Setting the Automatic By-pass<br />
Valve 25<br />
7.8 Check Operation of the<br />
Immersion Heaters 26<br />
7.9 Demonstration to User 26<br />
8.0 Maintenance<br />
8.1 Maintenance Requirements 27<br />
8.2 Check Cylinder <strong>Water</strong> Supply 27<br />
8.3 Descaling Immersion Heaters 27<br />
8.4 Operation of Cylinder Safety<br />
Valves 28<br />
8.5 Operation of Primary System<br />
Safety Valve 28<br />
8.6 Primary System Expansion<br />
Vessel Charge Pressure 28<br />
8.7 Electrical Checks 29<br />
9.0 Fault Finding and Servicing<br />
9.1 Fault Finding 30<br />
9.2 Replacement Parts 35<br />
9.3 Servicing 37<br />
10.0 Guarantee 43<br />
11.0 Spares Stockists 44<br />
2 <strong>Installation</strong> & Servicing Instructions