23.02.2014 Views

2 K SETS - Energija plus

2 K SETS - Energija plus

2 K SETS - Energija plus

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNI 9490-10779 FIRE-FIGHTING UNITS<br />

WITH 1-2 K-NKP-G ELECTRIC PUMPS<br />

Main components foreseen by the UNI 9490 standard<br />

5<br />

12<br />

1 2 7 6<br />

10<br />

3<br />

A<br />

11<br />

B<br />

4<br />

9<br />

8<br />

1 PUMP + PILOT<br />

P1<br />

P3<br />

6 7 10 5 12<br />

1<br />

2<br />

2<br />

A<br />

11<br />

3<br />

B<br />

3<br />

B<br />

P2<br />

P1<br />

P3<br />

9 8<br />

4<br />

2 PUMPS + PILOT<br />

A - Connector for suction tank<br />

To be connected to the bottom of the suction tank<br />

with a check valve.<br />

Only for overhead installation.<br />

B - Check valve control tap<br />

To be connected to the drain for overhead and<br />

underhead installations.<br />

4 - Water recirculation diaphragm to be connected:<br />

- to the top of the suction tank for overhead<br />

installations.<br />

- to the top of the water tank<br />

for underhead installation.<br />

P1 - Pump no. 1<br />

P2 - Pump no. 2<br />

P3 - Pilot Pump<br />

1 - Pilot pump control panel<br />

2 - Pump control panel<br />

3 - Inspectable check valve<br />

5 - Main pump start pressure switch<br />

6 - Delivery manifold<br />

7 - Membrane expansion tank<br />

8 - Suction valve<br />

Optional for underhead installations<br />

9 - Anti-vibration joint (optional)<br />

10 - Flow meter (optional)<br />

11 - Vacuum pressure gauge<br />

12 - Manual test tap<br />

121<br />

®

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!