BROCHURE GREENBUILD - SVIZZERA
SOLID TIMBER HOUSES - VOLLHOLZHAUSER - MAISONS EN BOIS MASSIF - CASE IN LEGNO MASSICCIO
SOLID TIMBER HOUSES - VOLLHOLZHAUSER - MAISONS EN BOIS MASSIF - CASE IN LEGNO MASSICCIO
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6 MONTHS AFTER<br />
PROJECT<br />
1° DAY | h:7.00<br />
1° DAY | h:19.00<br />
...HASTE MAKES WASTE...<br />
Processing time of a three-floor family house<br />
(including a lifts-shaft made of wood):<br />
- Set-up time of the basic structure: 6 days<br />
- Turnkey delivery: 6 months<br />
- Extended warranty of the structure: 50 years<br />
...GUT DING BRAUCHT<br />
GUT WEIL...<br />
2° DAY | h:18.00<br />
3° DAY | h:19.00<br />
4° DAY | h:18.34<br />
Fertigungszeit für ein dreigeschössiges<br />
Einfamilienhaus (inkl. Fahrstuhlschacht aus Holz):<br />
- Montagezeit der Grobstruktur: 6 Tage<br />
- Schlüsselfertige Übergabe: 6 Monate<br />
- Produktgarantie: 50 Jahre<br />
5° DAY | h:19.45<br />
6° DAY | h:13.00 3 MONTHS AFTER<br />
...TOUT A SON TEMPS...<br />
Fois pour la construction de logements<br />
unifamiliaux comprenant des PT + P1° + P2°<br />
(y compris la cage d’ascenseur de bois):<br />
- Délai de l’Assemblée: 6 jours<br />
- Temps pour accessoiriser la structure: 6 mois<br />
- Garantie de temps de la structure: 50 ans<br />
...OGNI COSA HA IL SUO<br />
TEMPO...<br />
Tempi relativi alla realizzazione di unità<br />
unifamigliare composta da PT + P1° + P2°<br />
(compreso vano ascensore in legno):<br />
- Tempi di montaggio struttura: giorni 6<br />
- Tempi per accessoriare la struttura: mesi 6<br />
- Tempi di garanzia della struttura: anni 50