MUNICIPALITY OF LAMBTON SHORES<br />
CL Report No. 138-2012 Monday, November 12, 2012<br />
TO:<br />
FROM:<br />
RE:<br />
Mayor Weber and Members <strong>of</strong> Council<br />
Carol McKenzie, Clerk<br />
Industrial Wind Turbines - Information Report<br />
RECOMMENDATION:<br />
For review, discussion and further direction.<br />
REPORT<br />
<strong>The</strong>re are 2 Industrial Wind Turbines (IWT) projects proposed for the <strong>Municipality</strong> <strong>of</strong><br />
<strong>Lambton</strong> <strong>Shores</strong> that are working through the Provincial “Renewal Energy Application”<br />
approvals process:<br />
Cedar Point Wind Project, which is a project by Suncor in the<br />
Municipalities <strong>of</strong> <strong>Lambton</strong> <strong>Shores</strong>, Plympton-Wyoming and Warwick.<br />
<strong>The</strong> current plan has 62 wind turbines, (24 shown as being in <strong>Lambton</strong><br />
<strong>Shores</strong>) with an estimated nameplate capacity <strong>of</strong> up to 100 M.W., and is<br />
scheduled for commercial operation in summer <strong>of</strong> 2014. This project was<br />
awarded a Feed In Tariff (FIT) contract in July <strong>of</strong> 2011.<br />
Suncor’s current plan is for the final provincially required public open house to be<br />
held in January <strong>of</strong> 2013, and has recently provided the <strong>Municipality</strong> with the<br />
DRAFT project documents for review, with comments required by mid January.<br />
<strong>The</strong>se are the same documents that are required to be provided for public review<br />
a minimum <strong>of</strong> 60 days before the public meeting.<br />
Jericho Wind Inc. is a project by Nextera in the Municipalities <strong>of</strong> <strong>Lambton</strong><br />
<strong>Shores</strong>, Warwick and North Middlesex, and is proposed to have<br />
approximately 92 wind turbines, (approximately 80 in <strong>Lambton</strong> <strong>Shores</strong>)<br />
with an estimated nameplate capacity <strong>of</strong> 150 M.W. This project has also<br />
been awarded a Feed In Tariff (FIT) contract.<br />
<strong>The</strong> DRAFT project documentation on the Nextera Project was submitted on November<br />
8 th , and it is anticipated that the final provincially mandated public meeting will be<br />
scheduled in February <strong>of</strong> 2013.<br />
<strong>The</strong> plans to bring a number <strong>of</strong> Industrial Wind Turbines (IWT) into the area have<br />
caused conflict within the <strong>Lambton</strong> <strong>Shores</strong>’ community, as some residents have signed<br />
contracts with the Wind Energy companies and are in favor <strong>of</strong> the projects proceeding,<br />