26.04.2014 Views

View - The Municipality of Lambton Shores

View - The Municipality of Lambton Shores

View - The Municipality of Lambton Shores

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RU 11) Provide “as built drawings” for the distribution lines and facilities, in both<br />

paper and digital formats, showing the location <strong>of</strong> the new utility in relation to the<br />

existing utilities.<br />

RU 12) be required to obtain permission from the municipality prior to change to<br />

any approved plan.<br />

RU 13) agree that the project will have the non exclusive right to use the road.<br />

RU 14) acknowledge that the Half load season limits will apply to the project.<br />

RU 15) submit plans for the proposed “staging areas” and “crane roads” if on<br />

municipal roads.<br />

RU 16) be required to obtain permission from the municipality for the use <strong>of</strong> any<br />

unopened road allowances.<br />

RU 17) agree to be responsible for access for vehicles on any unopened roads,<br />

or road that is not municipally maintained in the winter.<br />

RU 18) mark the location <strong>of</strong> any services located on an unopened road<br />

allowance.<br />

ROADS PROVISIONS - GENERAL<br />

RG 1) no access roads will be permitted through municipal property or using<br />

existing municipal access roads.<br />

RG 2) in accordance with the municipal policy, municipal permission is required<br />

prior to any removal <strong>of</strong> any tree from the Municipal road allowance. Tree<br />

replacement will be accordance with the “Tree Retention and Replacement<br />

Policy”.<br />

RG 3) the developer and municipality will jointly determine the process for<br />

relocating the project’s infrastructure in the future if necessary.<br />

RG 4) if it is necessary for a road to be closed, the developer will follow the<br />

municipal road closing protocol.<br />

RG 5) the municipality shall have the authority to order the stoppage <strong>of</strong> work or<br />

cessation <strong>of</strong> activities on the highway where the conditions <strong>of</strong> the agreement<br />

have not been met.<br />

RG 6) in addition to the requirement to call for locates prior to undertaking work,<br />

the developer will be required to participate in the “Ontario One Call” program to<br />

reduce damages in the future to underground facilities and promote safe<br />

excavations.<br />

107

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!